Laserfiche WebLink
16 Febuary 2022 AdvancedGee <br />Project No. 22-6747 An Employee -Owned Company <br />Page 13 of 13 N <br />Treatment System Standards. <br />Installation of a septic tank that is larger than the minimum requirement to offset <br />the elevated nitrate loading rate or install an engineered designed septic system <br />to reduce and mitigate the elevated nitrate levels. <br />• Once the new domestic water well is installed, groundwater samples should be <br />collected from the well and analyzed for nitrates and dibromo chloropropane <br />(DBCP). <br />13.0. LIMITATIONS <br />Our professional services were performed using that degree of care and skill ordinarily <br />exercised by environmental consultants practicing in this or similar localities. The findings <br />were based on field testing results. Evaluations of the hydrogeologic conditions at the site <br />for the purpose of this investigation were made from a limited number of available data <br />points (i.e., test hole and field data) and subsurface conditions may vary away from these <br />data points. No other warranty, expressed or implied, is made as to the professional <br />interpretations, opinions and recommendations contained in this report. <br />