My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014850
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACKER ISLAND
>
11050
>
2600 - Land Use Program
>
PA-2200045
>
SU0014850
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:21:52 AM
Creation date
4/1/2022 8:54:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014850
PE
2632 - ADMINISTRATIVE USE - GENERAL (A)
STREET_NUMBER
11050
Direction
W
STREET_NAME
ACKER ISLAND
City
STOCKTON
Zip
95219
APN
13102001
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
11050 W ACKER ISLAND STOCKTON 95219
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Applicant shall contact Robert McClellon, Program Coordinator, Small Public Water System <br />Program, at (209) 468-0332, to determine if the existing well can be permitted as a public water <br />system prior to issuance of building permits. If a public water system is required, applicant shall <br />submit a Small Public Water System preliminary technical report to the California State Water <br />Resources Control Board, Division of Drinking Water (Water Board) at least six months before <br />initiating construction of any water related improvement, as defined. The issuance of a permit to <br />operate a small public water system by the local primacy agency (EHD) is prohibited without the <br />concurrence of the Water Board. Please contact Brian Kidwell, P.E. with the SWRCB Division of <br />Drinking Water at (209) 948-3963 concerning the requirements for preliminary technical report <br />submittal prior to issuance of building permits. <br />If the Water Board determines that an onsite well shall be used as the potable water source, a <br />permit application to operate Small Public Water System shall be submitted to the EHD for <br />approval prior to issuance of building permits. To issue a permit to operate, concurrence from <br />the Water Board is required. A yearly permit to operate a public water system will be required by <br />the EHD prior to sign off of the certificate of final occupancy (San Joaquin County Development <br />Title, Section 9-1120.2 and 9-1115.9.). <br />The supplier must possess adequate financial, managerial, and technical capability to assure <br />delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br />County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title 22, and Health <br />and Safety Code, Section 116525 116570. <br />5. Submit two (2) hardcopy sets, or one (1) electronic version, of food facility plans to the <br />a. Environmental Health Department for review and approval prior to issuance of building <br />b. permit(s) (California Retail Food Code, Article 1, 114380). The fee will be based on the <br />c. current schedule at the time of payment. <br />6. Any geotechnical drilling shall be conducted under permit and inspection by The Environmental <br />Health Department (San Joaquin County Development Title, Section 9-1115.3 and 9-1115.6). <br />
The URL can be used to link to this page
Your browser does not support the video tag.