My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2551
>
2300 - Underground Storage Tank Program
>
PR0231659
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 4:20:40 PM
Creation date
4/6/2022 9:51:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231659
PE
2361
FACILITY_ID
FA0003849
FACILITY_NAME
Verizon Business: MANTECA
STREET_NUMBER
2551
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19801005
CURRENT_STATUS
01
SITE_LOCATION
2551 E LOUISE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 5 . MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System Certification Form must be prepared for each control panel. <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Pnumercator TMS -2000 <br /> Attach the post-certification reports if the monitoring system is capable of <br /> generating either; ❑✓ Monitoring System Set- up ❑✓ Alarm History Report <br /> Yes No NA <br /> All monitoring equipment is operational per manufacturer' s specifications ? ❑ <br /> Secondary containment systems are free of damage , debris , or liquid ? 0 ❑ <br /> Are the audible and visual alarms operational ? 0 ❑ <br /> All sensors have been : 1 ) visually inspected for wiring kinks , breaks and residual ❑ ❑ <br /> buildup on floats ; and 2 ) tested for functionality and confirmed operational ? <br /> Are all sensors installed to detect a release at the earliest opportunity in the ❑✓ ❑ ❑ <br /> secondary containment? <br /> The monitoring system set- up was reviewed , and proper settings confirmed ? ❑ ❑ <br /> Was the monitoring control panel ' s backup battery visually inspected , functionally ❑� ❑ ❑ <br /> tested , and confirmed operational ? <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- ❑ ❑ 0 <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment ❑ ❑ ❑✓ <br /> monitoring system fails to operate or is electrically disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment ❑ ❑ Z <br /> monitoring system detects a release ? Which sensors initiate positive shut down ? <br /> ( Check all that apply) ❑ Sump ❑ UDC <br /> If monitoring system alarms are relayed to a remote monitoring center , is all ❑� ❑ ❑ <br /> communication equipment operational ? <br /> Describe all answers marked "No " or "Fail" and proposed remedy in Section 9 . <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 2 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.