My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2551
>
2300 - Underground Storage Tank Program
>
PR0231659
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 4:20:40 PM
Creation date
4/6/2022 9:51:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231659
PE
2361
FACILITY_ID
FA0003849
FACILITY_NAME
Verizon Business: MANTECA
STREET_NUMBER
2551
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19801005
CURRENT_STATUS
01
SITE_LOCATION
2551 E LOUISE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8 . IN -TANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control . <br /> ❑ Check this box if NO tank gauging equipment is installed . Yes No NA <br /> (Do not complete this section if either box is checked. ) <br /> All wiring has been : 1 ) visually inspected for kinks , breaks and proper entry and ❑✓ ❑ ❑ <br /> termination ; and 2 ) tested for ground faults ? <br /> Were all in -tank gauging probes visually inspected for damage and residue buildup ❑✓ ❑ ❑ <br /> to ensure that floats move freely , functionally tested , and confirmed operational ? <br /> Was accuracy of system ' s product level readings tested ? 0 ❑ ❑ <br /> Was accuracy of system ' s water level readings tested ? ❑ ❑ <br /> Were all probes reinstalled properly ? ❑ ElWere all items on the equipment manufacturer' s maintenance checklist ❑ p <br /> completed ? <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> T- 1 / Pnumercator T- 1 / Diesel 0 ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> g . COMMENTS <br /> Describe all answers marked "No " or "Fail" and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Page 5 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.