My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DOAK
>
240
>
2800 - Aboveground Petroleum Storage Program
>
PR0528648
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 8:50:52 AM
Creation date
4/6/2022 12:35:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0528648
PE
2832
FACILITY_ID
FA0019249
FACILITY_NAME
RIPON FUEL FACILITY
STREET_NUMBER
240
STREET_NAME
DOAK
STREET_TYPE
Blvd
City
RIPON
Zip
95366
APN
25933015
CURRENT_STATUS
01
SITE_LOCATION
240 Doak Blvd
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br />Aboveground Petroleum Storage Act Inspection Report <br />Date: <br />March 30, 2022 <br /> Facility Address: <br /> 240 Doak Blvd, RIPON <br /> Facility Name: <br /> RIPON FUEL FACILITY <br />General Requirements for SPCC Plans <br /> 623 □ V □ R □ COSFailure to conduct complete annual discharge prevention briefings for oil-handling personnelCFR 112.7(f)(3) <br /> 624 □ V □ R □ COSPlan failed to address security of site and valves, lock out/tag out, and lightingCFR 112.7(g) <br /> 625 □ V □ R □ COSFacility failed to implement security measures listed in the SPCC Plan (lighting, security, etc.)CFR 112.7(g) <br /> 626 □ V □ R □ COSPlan failed to adequately discuss facility tank car and tank truck loading/unloading rackCFR 112.7(h) <br /> 627 □ V □ R □ COSLoading/unloading rack containment system not adequate to contain spillCFR 112.7(h)(1) <br /> 628 □ V □ R □ COSFailed to provide vehicular departure warning system for loading and unloading racksCFR 112.7(h)(2) <br /> 629 □ V □ R □ COSFailure to include in the Plan discussion of conformance with Federal and State requirementsCFR 112.7(a)(1), <br />112.7(j) <br /> 630 □ V □ R □ COSFailed to evaluate field constructed container for brittle fracture and take appropriate actionCFR 112.7(i), <br />25270.4.5(a) <br /> 631 □ V □ R □ COSFailure to provide general secondary containment or alternative for oil-filled operational equipmentCFR 112.7(k) <br /> 632 □ V □ R □ COSFailed to document evaluation of discharge for field-constructed tanks due to brittle fractureCFR 112.7(i), <br />25270.4.5(a) <br /> 633 □ V □ R □ COSPlan failed to adequately discuss bulk storage containers including compatibility and containmentCFR 112.8(c)(1)&(2) <br />SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 701 □ V □ R □ COSFailed to inspect accumulations prior to discharge and ensure controlled drainage from diked areasCFR 112.8(b)(1) <br /> 702 □ V □ R □ COSFailed to use manual open-and-closed design valves for the drainage of diked areasCFR 112.8(b)(2) <br /> 703 □ V □ R □ COSFailed to design facility drainage system from undiked areas to retain in the facilityCFR 112.8(b)(3), <br />112.8(b)(4) <br /> 704 □ V □ R □ COSFailed to provide two lift pumps for more than one continuous treatment unit for drainage waterCFR 112.8(b)(5) <br /> 705 □ V □ R □ COSContainer not compatible with oil stored and/or storage conditionsCFR 112.8(c)(1) <br /> 706 □ V □ R □ COSFailed to provide and maintain adequate secondary containment for bulk storage tanksCFR 112.8(c)(2) <br /> 707 □ V □ R □ COSFailure to follow the criteria of this section while allowing drainage of uncontaminated rainwaterCFR 112.8(c)(3) <br /> 708 □ V □ R □ COSContainment systems for bulk storage tanks are not sufficiently impervious to contain oil on siteCFR 112.8(c)(2), <br />25270.4.5(a) <br /> 709 □ V □ R □ COSFailed to maintain records of drainage from diked areasCFR 112.8(c)(3)(iv) <br /> 710 □ V □ R □ COSFailed to provide corrosion protection for partially buried tanksCFR 112.8(c)(5) <br /> 711 □ V □ R □ COSPlan failed to adequately discuss procedures to test or inspect each container for integrityCFR 112.8(c)(6) <br /> 712 ■ V □ R □ COSFailed to perform scheduled tank tests or inspections by appropriately qualified personnelCFR 112.7(e), 112.8(c) <br />(6) <br /> 713 □ V □ R □ COSFailed to test or inspect each container for integrity based on industry standardsCFR 112.7(e), 112.8(c) <br />(6) <br /> 714 □ V □ R □ COSFailed to provide effective leakage control from defective internal heating coilsCFR 112.8(c)(7) <br /> 715 □ V □ R □ COSFailed to have a high level monitoring and to engineer or update containers to avoid dischargeCFR 112.8(c)(8), <br />25270.4.5(a) <br /> 716 □ V □ R □ COSFailed to regularly test liquid level sensing devices to ensure proper operationCFR 112.8(c)(8)(v) <br /> 717 □ V □ R □ COSFailed to observe effluent treatment frequently enough to detect potential dischargeCFR 112.8(c)(9) <br /> 718 □ V □ R □ COSFailed to promptly correct visible discharges and/or remove accumulations of oil in diked areasCFR 112.8(c)(10) <br /> 719 □ V □ R □ COSFailed to locate properly or provide sufficient secondary containment for mobile/portable containersCFR 112.8(c)(11) <br />FA0019249 PR0528648 SC001 03/30/2022 <br />EHD 28-01 Rev. 12/06/2021 Aboveground Petroleum Storage Act OIRPage 3 of 6 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD
The URL can be used to link to this page
Your browser does not support the video tag.