My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACKVILLE
>
26680
>
1900 - Hazardous Materials Program
>
PR0547590
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 9:10:58 AM
Creation date
4/6/2022 1:33:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0547590
PE
1958
FACILITY_ID
FA0027081
FACILITY_NAME
BOKISCH INC.
STREET_NUMBER
26680
Direction
N
STREET_NAME
MACKVILLE
STREET_TYPE
RD
City
CLEMENTS
Zip
95227
CURRENT_STATUS
01
SITE_LOCATION
26680 N MACKVILLE RD
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERS Consolidated Emergency Response/Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply): cit. <br /> ❑x 1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑x 3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply): c12. <br /> ❑x 1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑x 3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: c13. <br /> PRIMARY EMERGENCY COORDINATOR NAME: Markus BOkisch PHONE NO.:(209)614-4600 PHONE NO.: <br /> ALTERNATE EMERGENCY COORDINATOR NAME: Elizabeth BOkis& PHONE NO.:(209)607-8986 PHONE NO.: <br /> ❑Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note:If more than one alternate emergency coordinator is designated,attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases,fires and/or explosions. <br /> Dl. <br /> ❑x 1. MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC.; <br /> ❑2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls,built-in berms); <br /> ❑3. PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g.,Pads,spill pigs,spill pillows); <br /> ❑4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> ❑5. LINED TRENCH DRAINS AND/OR SUMPS; <br /> ❑6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> ❑x 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> ❑x 8. STOP PROCESSES AND/OR OPERATIONS; <br /> ❑9. AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> ❑x 10.SHUT OFF WATER,GAS,ELECTRICAL UTILITIES; <br /> ❑x 11.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> ❑x 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> ❑x 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> ❑x 14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> ❑x 15.REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> ❑x 16.HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> ❑x 17.USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> ❑ 18.VACUUM SUCTION USING APPROPRIATE VACUUM(e.g.,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> ❑ 19.DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> ❑20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑x 21.OTHER(Specify): (800) 732-4645 D2. <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply): El. <br /> ❑ 1. BELLS; E2. <br /> ❑2. HORNS/SIRENS; <br /> ❑x 3. VERBAL(i.e.,Shouting); <br /> ❑x 4. OTHER(Specify): <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street corner): E3. <br /> Note:The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: E4. <br /> ❑ 1.WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑x 2.EVACUATION MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑3. OTHER(Specify): E5. <br /> Note:Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following): Fl. <br /> ❑ 1. HAVE BEEN DETERMINED NOT NECESSARY; <br /> ❑x 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): H M B P Copy Sent t0 County fire departe ment. t2. <br /> Note:Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency services <br /> contractors should be made for your facility,if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev.03/07/17 Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.