My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2023 11:25:57 AM
Creation date
4/7/2022 8:08:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O P W4* <br /> FUELING CONTAINMENT SYSTEMS <br /> Patent Pending A COMPANY <br /> ......rf, <br /> ' <br /> preven Ion Valve <br /> Are you Prepared <br /> for New EPA <br /> Overfill Valve Test <br /> Requirements <br /> currently in <br /> the making ? NowY <br /> ou can be ahead <br /> - of the compliance curve <br /> Spend 60 Seconds ;s with the new patent pending <br /> 60 Minutes per Tank. OPW Testable 7150-T Overfill <br /> Prevention Valve <br /> The easiest, quickest and most cost efficient <br /> way to ensure that your overfill valves will <br /> operate when called upon. . . verifiable without <br /> removing them from the tanks <br /> F y The update to the 1988 EPA UST regulations are in process <br /> now, periodic overfill valve operational tests and inspection <br /> requirements are being defined <br /> Our new 71 SO-T Testable Overfill Prevention Valve is the only UST <br /> Overfill Prevention Valve that is testable from the surface...without <br /> removal from the tank - test in 60 seconds vs 60 minutes per tank! <br /> With the 71 SO-T, you now have the ability to verify proper <br /> installation, orientation, and help troubleshoot delivery problems <br /> without risking damage to the system by removing the <br /> valve from the tank <br /> Leading The Way in Fueling Innovation Worldwide <br /> www . opwglobal . com <br />
The URL can be used to link to this page
Your browser does not support the video tag.