Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: incon sts <br /> Sump/UDC ID regular stp premium stp diesel stp <br /> Sump Manufacturer western/f western/f western/f <br /> Sump Depth (inches) 68 inches 68 inches 68 inches <br /> Sump Bottom to Top of 28 inches 28 inches 28 inches <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:58pm 1:52pm 12:58pm <br /> Initial Reading 6.7382 in 6.7280 4.8264 in <br /> Test End Time 1:13pm 2:52pm 1:13 pm <br /> Final Reading 6.7384 6.7270 4.8279 <br /> Change in Reading 0002 001 in .0015 <br /> Pass/Fail Criteria 002 in 002 in 002 <br /> Tightness Test Results M Pass ❑ Fail M Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID regular fill premium fill diesel fill <br /> Sump Manufacturer western/f western/f western/f <br /> Sump Depth (inches) 68 inches 68 inches 68 inches <br /> Sump Bottom to Top of 24 24 24 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 3:26pm 2:49pm 1:52pm <br /> Initial Reading 6.0463 6.0576 in 6.5383 in <br /> Test End Time 3:04pm 3:04pm 2:07 pm <br /> Final Reading 6.0499 6.0541 6.5839 <br /> Change in Reading .0036 + .0035- .0006- <br /> Pass/Fail Criteria .002 .002 .002 <br /> Tightness Test Results ® Pass ElFail ElPass M Fail ® Pass ❑ Fail ❑ Pass El Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />