Laserfiche WebLink
8. If the project will use significant amounts of any of the <br />following, estimate amount or note that a large amount will be <br />consumed: <br />a. water C. natural gas NLAI)e <br />b. electricity « <br />9. Describe any discharges into surface waters (including intermit- <br />tant streams) PC) h)V=�- <br />10. Will the project result in substantial air emissions or <br />deterioration of ambient air quality? )� NO _YES <br />11. Will there be objectionable odors? Y No _YES <br />12. Describe any alteration of air movements, moisture, or tem- <br />perature, or any change in climate, either locally or. <br />regionally Nc*% <br />13. Specify any hazardous materials whic will require storage, <br />disposal, or transportation P O <br />14. Describe any exposure of people to noise, hazardous materials or <br />situations ►J C) � <br />15. Describe any displacement of people as a result of the project <br />16. Describe any congestion which might occur on roadways or at <br />interchanges or intersections as a result of the project <br />N 01.�C <br />a. <br />Plan -44 <br />MITIGATION MEASURES <br />If any environmental impacts were described in the previous section, <br />list and describe measures proposed to minimize the impacts. (Attach <br />additional pages, if necessary. Use the following format.) <br />1. Impac <br />Mitigation Measures 00111 2aQvtatno <br />-7- (9/85) <br />