My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 4:55:33 PM
Creation date
4/18/2022 7:58:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> ------------ ----------------------------------------------------- <br /> S�teAddress: SYSTEM TRANSPORT 707 E. ROTH ROAD FRENCH CAMP CA 95231 <br /> Al GIN BLIIC09HOP OMU <br /> - : - - . DIESEL. . . . . . . . N. <br /> . . . . . . . . . <br /> L <br /> x <br /> . . . . . . . SAT 2. <br /> 2. x 1 . . . . . . . . . . . . . . b F <br /> ?1=?LN.\LLAR <br /> -kPIPD;G= . . . . . F=FELLS <br /> (_ €C1S45j T=TC.-RSIE <br /> I}raw ofpiP P=PRME <br /> mat of sunup and x SAT 1.� V=VkPOR <br /> LTDC's.-a X=SIZLIPSENSOR <br /> uudKgsound L=Leak Detector <br /> &awmff i . . . . . . . . . . . - . x'1=hlam1'MY. <br /> @99WARkWre E=Brine Sensar <br /> catmca specu3ate I=Smart Sensor <br /> b'rue prink. Am items uadeesvuad that arenot wsrb:e to lite ceitif3ing teelmicmnare a S=STP <br /> r{rr r prareesi.onal opinion rmlr an3 are eolelc for infxn>afio->zal pautwees. Drazing not to C=Floals&Charms <br /> scale. E=E Stop <br /> Date map was dravm:5M X19. <br /> Instructions <br /> IF you already have a diageam that shows all required information-you may include st rather than this page,wdt your Monitoring System Cartifwation. On yourstte plats, <br /> show tire general layout of tanks ano piping. Clearly idenfrfy beaVans of the following egwpnrert,if installed:monitorscg system control panels;sensors maniwritW lank <br /> annular spaces,sumps,dispenser pans,spill rarrtainers,or other s-ocndary aoniainmentareas:mechaamal on ebormnia Jine leak deteclars;and in-tank Iiqu�d level <br /> probes('d used foq Seakdeteabon). In the space provik ad,note the date this Site Ran was prepared. <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.