Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: <br /> 713 N EL DORADO ST STOCKTON CA <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C STORE . . . . . . . . . . . . . . . n <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . 12 . 11 . . . . . . . . . . 6 .5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . E-STOP. . . . . . . . . . . . . . . . . . . . . . . . . . <br /> x x <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . 10 . . . . .9. . . . . 4 . . . . . .3. . . . . . . . . . . . . . . . . . . . . . <br /> KEY <br /> A=ANNULAR <br /> x . . . . . . . . . . . . . . . . . . . . . . . . . F=FILLS <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . T=TURBINE <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . P=PROBE <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . V=VAPOR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . X=SUMP SENSOR <br /> . 8. . . . . .7. . . . . .2. . . 1. . . . . . . . . . L=Leak Detector <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M=Manway <br /> I B=Brine Sensor <br /> x I=Smart Sensor <br /> S=STP <br /> C=Floats&Chains <br /> E=E Stop <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . O v L O O L o O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . v v v . . . . . . . . . . . . . G46BACE . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . .O�O%O^.ven{ts . . . . <br /> *PIPING* u O <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> (ARROWS) <br /> Drawing of piping Any items underground that are not visible to the certifying technician are a <br /> exit of sump and professional opinion only and are solely for informational purposes. Drawing not to <br /> UDC's.No scale. <br /> underground <br /> drawing is accurate, <br /> we cannot Date map was drawn: 513121 <br /> speculate blue <br /> prints. <br /> vl _ /l Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 <br /> Page 6 of 6 <br />