Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: SRH FOOD&GAS MART-749 E DOCTOR M.L.K DR STOCKTON,CA <br /> *PIPING* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Drawing ofpiping . . . . . . . . . . . . . . . . . <br /> exit of sump and . . . . . . . . . . <br /> UDC's.No <br /> underground _ _ _ _ _ _ _ _ _ O _ . <br /> drawing is . . . . . . . . . . . . . CAS <br /> accurate,we <br /> cannot speculate ' ' ' ' ' ' ' ' ' ' ' ' ' <br /> blue prints. ' ' ' ' ' ' ' ' ' ' ' ' ' <br /> vfid . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . TLs <br /> 350 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> L . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> A O <br /> x <br /> DIE. <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> L KEY <br /> 87 . A=ANNULAR <br /> X <br /> F=FILLS <br /> T=TURBINE <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . P=PROBE <br /> . . . . . . . . . . . . . . V=VAPOR <br /> X=SUMP SENSOR <br /> . . . . . . . . . . . . . . . . . . . . . . . . L=Leak Detector <br /> L M=Manway <br /> A e ° .91 B=Brine Sensor <br /> X XX <br /> I=Smart Sensor <br /> S=STP <br /> C=Floats&Chains <br /> E—E Stop <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . � � .��. . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> CHARTER WAY <br /> _-lryt iusvariIhcearefrau3r:iS1efa1 Fceru{>r3rng1'FV Wdantraa <br /> fi"�N.S51'flfiTl dflfldPi dl 'laid—N-W6 ',fA' Draring <br /> ravf ia:ede <br /> Date map was drawn 5/28/21 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />