Laserfiche WebLink
3931 Newton Road PR0515675 <br /> March 28, 2022 Program: APSA <br /> PHOTO 2: SPCC plan states that the 10,000 gallon diesel tank has a liquid level gauge for overfill prevention. No gauge was observed on the 10,000 <br /> allon diesel tank. <br /> MWI <br /> Spill Prevention,Control,and Countermeasure(SPCC)Plan <br /> Gillies Trucking Inc. <br /> "6W 3931 iNewton Road <br /> Stockton,California 95205 <br /> TRUCKING,INC. November 2018 <br /> Page 21 <br /> Pressures or marine environments). Consequently,ATC interprets SP001 to imply that unless <br /> extenuating or mitigation factors are:present,a new AST's)FEI should first occur alter 20 years of <br /> service. <br /> The table below identifies the Category 1 containers between 5,001 and 30,D00 gallons in <br /> capacity storing oil at the facility. The table also includes the container's age',and the date by <br /> which they will need to have a FEI performed by a STICI.If the year of manufacture cannot be <br /> established by the manufacturer's plate or otherwise determined,the ASTs will be assumed to be <br /> at least 20 years old and receive a FEI accordingly. <br /> MSA Container ID Contents Volume Manuffaacture Last FEI Next FEI <br /> aona <br /> MSA01 AST01 Diesel 10,000 Unknown 2019 2039 <br /> FEI=Formal E�dernal Inspections performed by a SP001 Certified Inspector. <br /> The FEI records are retained for at beast three years in Appendix J. <br /> The Professional Engineer's Certification of this plan serves as verification of the recommended <br /> integrity testing approach. <br /> 13.7. INTERNAL HEATING COILS[40 CFR§112.8(C)(7)]: <br /> Not applicable since there are no internal heating coils at the facility. <br /> 13.8. FAIL-SAFE ENGINEERING OF STORAGE CONTAINERS 140 CFR <br /> §112.8(c)(8)]: <br /> All oil storage containers at the facility are fail-safe engineered in accordance with good <br /> engineering practices to avoid oil discharges according to the federal SPCC Regulations. The <br /> diesel fuel tanks are equipped with site gauges and the amount of product ordered is based on <br /> ullage in the tanks. <br /> The transport truck driver and an employee remain in the vicinity during transfer operations to <br /> provide an immediate response system for determining the liquid level in the talnk during delivery. <br /> All gauges and alarms shall be regularly tested in accordance with manufacturer's <br /> recommendations. <br /> r If the year of manufacture cannot be determined,ASTs will be assumed to be 20 years old and receive F'EI accordingly. <br /> 8 Interval determined by STICI during last FEI. <br /> Lydia Baker, SR. REHS Page 2 of 5 <br />