My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACAMPO
>
775
>
2800 - Aboveground Petroleum Storage Program
>
PR0522201
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 9:13:28 AM
Creation date
4/20/2022 10:33:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0522201
PE
2832
FACILITY_ID
FA0009713
FACILITY_NAME
ACAMPO AG SVC
STREET_NUMBER
775
Direction
E
STREET_NAME
ACAMPO
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01314036
CURRENT_STATUS
01
SITE_LOCATION
775 E ACAMPO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S Q N J 0 A Q U I N Environmental Health Department <br /> - C Q U N T Y---- <br /> ` � Greatness grows here. <br /> Corrective Action Statement <br /> RE: March 28, 2022, Aboveground Petroleum Storage Act inspection report <br /> For each violation listed below, indicate if the violation has been corrected or wiil be corrected by a certain date <br /> Also, describe what was done to correct the violation in the space provided below each violation. Submit this <br /> completed form with the Return to Compliance Certification within 30 days of inspection. if you have any questions. <br /> please contact Lydia Baker at(209)616-3046 or Ibaker@sjgov.org. <br /> ACAMPO AG SVC, 775 E ACAMPO RD, CERS ID: 10182839, PR0522201 <br /> Violation#609 -Plan failed to address disposal methods for recovered materials. <br /> This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included i <br /> Describe actions taken or wi I be taken to correct violation: <br /> Violation#610 - Plan failed to adequately detail information and procedures for reporting a discharge. <br /> This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#612 -Plan doesn't have discharge prediction, including direction, rate of flow, and quantity of oil. <br /> This violation was corrected ❑ This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> sc(ibe actions taken or will be taken to correct violation: <br /> YAN(I ed <br /> Page 3 of 4 <br /> Rev,9!7612020 <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 I T 209 468-3420 � F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.