My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACAMPO
>
775
>
2800 - Aboveground Petroleum Storage Program
>
PR0522201
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 9:13:28 AM
Creation date
4/20/2022 10:33:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0522201
PE
2832
FACILITY_ID
FA0009713
FACILITY_NAME
ACAMPO AG SVC
STREET_NUMBER
775
Direction
E
STREET_NAME
ACAMPO
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01314036
CURRENT_STATUS
01
SITE_LOCATION
775 E ACAMPO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Are all valves free of leaks,corrosion and other <br /> damage?Follow manufacturers'instructions for <br /> regular maintenance of these items.Check the <br /> following and verify(as applicable): 11 <br /> ❑Anti-siphon valve �es ❑No 171 N/A <br /> 16 °Check valve jj��es ON ❑NIA <br /> °Gate valve �jyes ❑No ❑NfA <br /> °Pressure regulator valve FS <br /> s ❑No ❑N/A <br /> ❑Expansion relief valve as []No ❑N/A <br /> °Solenoid valve <br /> ❑Fire valve ❑No ❑NIA <br /> ❑Shear valve Was ❑No ❑NIA <br /> 17 Are strainers and filters clean and in good condition? Yes ❑NO ❑N/A <br /> Insulated Tanks <br /> Free of missing insulation? [--]Yes ENO N/A <br /> 18 Insulation free of visible signs of damage? <br /> Insulation adequately protected from water intrusion? <br /> 19 Insulation free of noticeable areas of moisture? ❑Yes ❑NO /A <br /> 20 Insulation free of mold? ❑Yes ENO /A <br /> 21 Free of visible signs of coating failure? []Yes ENO N/A <br /> Tank 1 Piping Release Detection <br /> 22 Is inventory control being performed and documented Yes ❑NO [IN/A <br /> if required? <br /> 23 Is release detection being performed and documented ❑yes ❑NO N/A <br /> if required? <br /> Other Equipment <br /> 24 Are electrical wiring and boxes in good condition? s ❑NO ❑N/A <br /> Has the cathodic protection system on Yes ❑NO ❑N/A <br /> 25 the tank been tested as required by <br /> the designing engineer? <br /> Annual Checklist Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.