My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACAMPO
>
775
>
2800 - Aboveground Petroleum Storage Program
>
PR0522201
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 9:13:28 AM
Creation date
4/20/2022 10:33:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0522201
PE
2832
FACILITY_ID
FA0009713
FACILITY_NAME
ACAMPO AG SVC
STREET_NUMBER
775
Direction
E
STREET_NAME
ACAMPO
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01314036
CURRENT_STATUS
01
SITE_LOCATION
775 E ACAMPO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STI SP001 Annual Inspection Checklist <br /> General Inspection Information: w ' <br /> Inspection Date: I I L i{2021 Prior Inspection Date. 1v Retain until date: 1' <br /> Inspector Name(print): Title: <br /> Inspector's Signature' <br /> Tank(s)inspected ID — <br /> Regulatory facility name and ID number(if applicable) <br /> Inspection Guidance: <br /> This checklist is intended as a model. Locally developed checklists are acceptable as long as they are substantially equivalent(as applicable). <br /> For equipment not included in this Standard,follow the manufacturer recommended inspection/testing schedules and procedures. <br /> The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure.This visual inspection does not require a Certified <br /> Inspector.It shall be performed by an owner's inspector per paragraph 4.1.2 of the standard. <br /> Remove promptly standing water or liquid discovered in the primary tank,secondary containment area,interstice,or spill container.Before discharge to the <br /> environment,inspect the liquid for regulated products or other contaminants and disposed of it properly. <br /> In order to comply with EPA SPCC(Spill Prevention,Control and Countermeasure)rules,a facility should regularly test liquid level sensing devices to ensure proper <br /> operation(40 CFR 112.8(c)(8)(v)). <br /> Non-conforming items important to tank or containment inteority require evaluation by an engineer experienced in AST design,a Certified Inspector,ora tank <br /> manufacturer who will determine the corrective action.Note the non-conformance and corresponding corrective action in the comment section. <br /> Retain the completed checklists for at least 36 months. <br /> Complete this checklist on an annual basis,supplemental to the owner monthly-performed inspection checklists. <br /> Note:If a change has occurred to the tank system or containment that may affect the SPCC plan,the condition should be evaluated against the current plan <br /> requirement by a Professional Engineer knowledgeable in SPCC development and implementation. <br /> ITEM STATUS COMMENTS/DATE CORRECTED <br /> Tank Foundation/Supports <br /> 1 Free of tank settlement or foundation washout? Yes ❑No <br /> 2 Concrete pad or ring wall free of cracking and es ❑No❑N/A <br /> spalling? <br /> Annual Checklist Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.