Laserfiche WebLink
Are all valves free of leaks,corrosion and other <br /> damage?Follow manufacturers'instructions for <br /> regular maintenance of these items.Check the <br /> following and verify(as applicable): <br /> ❑Anti-siphon valve JjYes ❑No [_1 N/A <br /> 16 a Check valve IQYes ❑No I''N/A <br /> o Gate valve A!(Yes ❑No I_1 N/A <br /> •Pressure regulator valve ❑Yes ❑No VIA <br /> o Expansion relief valve ❑Yes ❑No M$N/A <br /> n Solenoid valve <br /> ❑Fire valve ❑Yes ❑No Jill <br /> ❑Shear valve ❑Yes ❑No Ifl%/A <br /> 17 Are strainers and finers clean and in good condition? VYes ONO ❑N/A <br /> Insulated Tanks <br /> Free of missing insulation? []Yes ❑No $rN/A <br /> 18 Insulation free of visible signs of damage? <br /> Insulation adequately protected from water intrusion? err <br /> 19 Insulation free of noticeable areas of moisture? ❑Yes ❑NO ��rcN�/A <br /> 20 insulation free of mold? ❑Yes ❑NO 1[SN/A <br /> 21 Free of visible signs of coating failure? []Yes ❑NO I%N/A <br /> Tank I Piping Release Detection <br /> 22 Is inventory control being performed and documented ❑Yes ❑NO 49N/A <br /> if required? <br /> 23 Is release detection being performed and documented ❑Yes ❑NO KN/A <br /> if required? <br /> Other Equipment <br /> 24 Are electrical wiring and boxes in good condition? ;SYes ❑No El N/A <br /> Has the cathodic protection system on ❑Yes ❑NO I�IN/A <br /> 25 the tank been tested as required by <br /> the designing engineer? <br /> Annual Checklist Page 3 of 4 <br />