My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACAMPO
>
775
>
2800 - Aboveground Petroleum Storage Program
>
PR0522201
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 9:13:28 AM
Creation date
4/20/2022 10:33:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0522201
PE
2832
FACILITY_ID
FA0009713
FACILITY_NAME
ACAMPO AG SVC
STREET_NUMBER
775
Direction
E
STREET_NAME
ACAMPO
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01314036
CURRENT_STATUS
01
SITE_LOCATION
775 E ACAMPO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J 0 A Q I I I Irl Environmental Health Department <br /> CCUN r <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> ACAMPO AG SVC 775 E ACAMPO RD,ACAMPO March 28, 2022 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 605 CFR 112.7(a)(3), 25270.4.5(a)Plan failed to include an adequate facility diagram, or no facility diagram was <br /> included. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan failed to include an adequate <br /> facility diagram. The facility diagram was missing location and contents of each fixed storage container and storage <br /> area of portable containers. <br /> REGULATION GUIDANCE: (3) Describe in your Plan the physical layout of the facility and include a facility diagram, <br /> which must mark the location and contents of each fixed oil storage container and the storage area where mobile or <br /> portable containers are located.The facility diagram must identify the location of and mark as"exempt' underground <br /> tanks that are otherwise exempted from the requirements of this part under§ 112.1(d)(4).The facility diagram must <br /> also include all transfer stations and connecting pipes, including intra-facility gathering lines that are otherwise <br /> exempted from the requirements of this part under§ 112.1(d)(11). <br /> CORRECTIVE ACTION: Ensure that the SPCC plan includes a complete facility diagram. Provide proof of <br /> correction to the EHD. <br /> This is a minor violation. <br /> 609 CFR 112.7(a)(3)(v) Plan failed to address disposal methods for recovered materials. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC) Plan failed to address disposal <br /> methods for recovered materials. <br /> REGULATION GUIDANCE: The SPCC plan shall include: (v) Methods of disposal of recovered materials in <br /> accordance with applicable legal requirements; <br /> CORRECTIVE ACTION: Ensure that the SPCC plan addresses disposal for recovered materials in accordance with <br /> applicable legal requirements, submit proof of correction to the EHD. <br /> This is a minor violation. <br /> FA0009713 PR0522201 SCO01 03/28/2022 <br /> EHD 28-01 Rev.12/06/2021 Page 6 of 9 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.