My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084519 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1515
>
2900 - Site Mitigation Program
>
SR0084519 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2022 11:21:20 AM
Creation date
4/21/2022 11:18:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084519
PE
2903
FACILITY_ID
FA0026863
FACILITY_NAME
1515 FRESNO AVE INDUSTRIAL BUILDING DELVELOPMENT
STREET_NUMBER
1515
Direction
S
STREET_NAME
FRESNO
City
STOCKTON
Zip
95206
APN
16337034
ENTERED_DATE
11/22/2021 12:00:00 AM
SITE_LOCATION
1515 S fresno
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK PLAN FOR INSTALLATION OF PIEZOMETERS Irerracon <br />Seefried Warehouses Tracy, California <br />November 12, 2019 Terracon Project No. NA185181 <br />Installation of 3 piezometers at the locations detailed in Exhibit A-2. <br />2.1 Objectives <br />The objective of the proposed piezometer installation is to monitor groundwater at the site as it <br />relates to the development and geotechnical engineering aspects of the project. <br />2.2 Commitment to Safety <br />Terracon has a commitment to the safety of all its employees. As such, and in accordance with <br />our Incident and Injury I*ree@ safety culture, Terracon will develop a Project Safety Plan to be <br />used by our personnel during field services. Prior to commencement of on-site activities, Terracon <br />will hold a tailgate safety meeting to review site-specific job hazards and health and safety needs <br />for this specific project. In addition, prior to engaging in new on-site activities or tasks, we will re- <br />evaluate potential job hazards and appropriate safe working procedures as part of our Pre -Task <br />Planning process. At this time, we anticipate performing fieldwork in a Level D work uniform <br />consisting of hard hats, safety glasses, protective gloves, and steel -toed boots. It may become <br />necessary to upgrade this level of protection, at additional cost, while sampling activities are being <br />conducted in the event that petroleum or chemical constituents are encountered in soils or <br />groundwater that present an increased risk for personal exposure. <br />2.3 Work Plan <br />Terracon has provided this letter Work Plan to the SJCDEH detailing the methodologies described <br />below. Any SJCDEH comments to the letter Work Plan will be incorporated into a final plan. <br />2.4 Permitting <br />In conjunction with this Work Plan, Terracon has completed a SJCDEH Site Mitigation Well & <br />Boring Permit Application (see attached). <br />2.5 Utility Location and Geophysical Survey <br />Following SJCDEH approval of this Work Plan, and no later than 72 hours prior to intrusive <br />activities, Terracon will contact Underground Service Alert (USA) 811 North to arrange for <br />underground utility locates at the site. <br />To further evaluate the underground utilities at the site, a geophysical survey may be performed <br />in the vicinity of each of the proposed piezometer locations where mechanical drilling will be <br />performed. Terracon will utilize ground -penetrating radar (GPR) to detect concealed utilities at <br />Responsive Resourceful Reliable 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.