My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 2:54:27 PM
Creation date
5/2/2022 8:22:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />All tests marked “Fail” and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 2 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: <br />Tank ID <br />Tank Manufacturer <br />Tank Capacity <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br />6. TANK SECONDARY CONTAINMENT TEST <br />7. PIPE SECONDARY CONTAINMENT TEST <br />87 Unleaded 91 Premium T6 Auto Diesel (6 Disps) T1 Biodiesel (RV & Truck) <br />NOV NOV NOV NOV <br />10:00am 10:00am 10:00am 10:00am <br />5 PSI 5 PSI 5 PSI 5 PSI <br />11:00am 11:00am 11:00am 11:00am <br />5 PSI 5 PSI 5 PSI 5 PSI <br />0 PSI 0 PSI 0 PSI 0 PSI <br />0 PSI 0 PSI 0 PSI 0 PSI <br />X <br />T2 Biodiesel (Half Truck) T3 Biodiesel (Half Truck)Diesel Siphon Lines (2) Vacuum Source Chase <br />NOV NOV NOV NOV <br />11:30am 11:30am 11:30am 11:30am <br />5 PSI 5 PSI 5 PSI 5 PSI <br />12:30pm 12:30pm 12:30pm 12:30pm <br />5 PSI 5 PSI 5 PSI 5 PSI <br />0 PSI 0 PSI 0 PSI 0 PSI <br />0 PSI 0 PSI 0 PSI 0 PSI <br />X
The URL can be used to link to this page
Your browser does not support the video tag.