My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 2:54:27 PM
Creation date
5/2/2022 8:22:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />All tests marked “Fail” and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br />8. SUMP/UDC TEST <br />T1 Diesel STP T2 Diesel STP T3 Diesel STP 87 STP <br />Bravo Bravo Bravo Bravo <br />65" 63" 60" 58" <br />18" 15" 21" 18" <br />11:07am Visual Fail 11:07am 9:47am <br />7.7858 Visual Fail 5.2804 2.8015 <br />11:22am Visual Fail 11:22am 10:02am <br />7.7841 Visual Fail 5.2807 2.8018 <br />0.0017 Visual Fail -0.0003 -0.0003 <br />+/- 0.002 +/- 0.002 +/- 0.002 +/- 0.002 <br />91 STP T6 Auto Diesel UDC 14/15 <br />Bravo Bravo Bravo <br />57" 59" 30" <br />17" 18" 9" <br />10:12am 10:12am 2:40pm <br />3.8263 5.6180 7.7236 <br />10:27am 10:27am 2:55pm <br />3.8264 5.6193 5.5586 <br />-0.0001 -0.0013 2.1650 <br />+/- 0.002 +/- 0.002 +/- 0.002
The URL can be used to link to this page
Your browser does not support the video tag.