Laserfiche WebLink
PA-05-61 (UP), Pre-application <br /> March 9, 2005 <br /> Page 2 of 2 <br /> D. Construction of individual sewage-disposal-system(s) under permit and inspection by the <br /> Environmental Health Department is required at the time of development based on the Soil <br /> Suitability/Nitrate Loading Study findings (San Joaquin County Development Title, Section <br /> 9-1110.3 & 9-1110.4). <br /> NOTE: The Environmental Health Department anticipates that a Packaged Wastewater <br /> Treatment System may be required based on the Environmental Health Department's <br /> knowledge of impacted groundwater (nitrates) and a high water table in this area. <br /> E. Construct water well under permit and inspection of the Environmental Health Department <br /> prior to occupancy. Should the number of non-resident individuals exceed 24 for at least 60 <br /> days per year, or the number of service connections exceed four, a yearly permit to operate a <br /> public water system will be required by the Environmental Health Department(San Joaquin <br /> County Development Title, Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title 22, and Health <br /> and Safety Code, Section 116525 through 116570. <br /> NOTE: The Environmental Health Department will not support the use of the existing irrigation <br /> well for domestic purposes. <br /> F. Any geotechnical drilling shall be conducted under permit and inspection by The <br /> Environmental Health Department (San Joaquin County Development Title, Section 9- <br /> 1115.3 and 9-1115.6). <br />