Laserfiche WebLink
undergroundMmWTmk <br /> Secondary Corrtelnmsnt TosUng Report Form <br /> E. TANK SECONDARY CONTAIKM ENT TEST <br /> Test Method Developed by D Manufadurer 0 Induehy Standard 0 Prolbee onal Engineer <br /> Teat Type 0 Pressure Irl Vacuum C] H droatatic <br /> Test Eq-Ipment Used: mum auw <br /> Twk ID n 1"101"A <br /> Tank Manufacturer mOdGru wWhV aeom Nddft <br /> Tank Capadty gum 2%000 <br /> Teat Start Time Imam 10:20 Oe <br /> Initial Reading 10 ho 18 ho <br /> Tse!End Time 1fta un, 11do m <br /> Final Reading 10 he 10 he <br /> Change In Reading 0 0 <br /> PaealFaq CrlbOrie 0 0 <br /> Tightness Teat Results r7 Pass Q Fall © Pow D Fall D Paso 0 Fall D Paas D Fail <br /> T. PIPE SECONDARY CONTAINMENT TEST <br /> Teat Method Deveia� by 0 ManukdWer 0 Industry Standard D Pralbesional Enghroar <br /> Test Type M Pressure 0 Vacuum 0 Hydrovintic <br /> Test Equipment Used:Pr+ma wra owes <br /> Pipe Run lD W-1 167.2 In OkEw <br /> Pipe Manufacturer aMOMW snrnwnM snd&duw OfflfthNM <br /> Teat Start Time Sao am SOO rM Scum &Mom <br /> Initial Reading s Pd a rw s pw a Pa <br /> Test End Time 14dogun #a30 Am 10;30 see 10:0.0= <br /> Final Reading s pal a psi s pw s Pd <br /> Mange In Reading a 0 0 a <br /> Pass/Fall Crfteda a 0 e e <br /> Tightness Test Results M Paas 0 Fall © Pan D Fall D Pass 0 Fail M Paas D Fall <br /> Pipe Run ID <br /> Pipe Menufaaturer <br /> Test Start Time <br /> Initial Reading <br /> Teat End Time <br /> Final Reading <br /> Change In Reading <br /> Pass/Fall Criteria <br /> Tightness Test Results D Paas D Fag D Pass D Fall 0 as D Foli LO Pass D Fall <br /> Adali<VwW oopin of d*peas may be affedod. <br /> AN W&Hw*ed 1%r and any mpelht made before or durihg Me tUhtness leaf must be described in <br /> the COMMENTS seWan. <br /> Page 2 of 5 <br />