Laserfiche WebLink
TEAM MEMBER TRAINING SIGN4N SHEET <br /> Project: Hazardous Material Business Plan Review Meeting Date: <br /> Facilitator: Robb Johnson Piace/Room: WTPS tockon <br /> The following topics have been addressed.- <br /> 1. <br /> ddressed:1. Emergency Response/Contingency Plan training. <br /> 2. Spill notification procedures. <br /> 3. Spill response procedures. <br /> 4. Evacuation procedures. <br /> Name Signature <br /> -t/SrYl <br /> a 7 Z. <br /> �C;)-!S- <br /> 2�� z <br /> -�?edooso4l--v 7-11 <br /> Business plans shall include provisions for ensuring that the appropriate personnel receive initial and annual <br /> refresher training. All employees shall be trained in safety procedures in the event of a release or threatened <br /> release of a hazardous material, including, but not limited to, familiarity with the following plans and <br /> procedures: <br /> a) Immediate notification contacts to the appropriate local emergency response personnel and to the <br /> unified program agency. <br /> b) Procedures for the mitigation of a release or threatened release to minimize any potential harm or <br /> damage to persons, property, or the environment. <br /> c) Evacuation plans and procedures, including immediate notice, for the business site. <br /> Page I of 1 <br />