Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br />INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): <br />Rev. 03/07/17 Page <br />CIL <br />1, VERBAL WARNINGS; 9 2, PUBLIC ADDRESS OR INTERCOM SYSTEM; R1 3. TELEPHONE; <br />❑ 4. PAGERS; JE 5, ALARM SYSTEM; 916, PORTABLE RADIO <br />NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): <br />C12. <br />n 1. VERBAL WARNINGS; [12, PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑� 3. TELEPHONE; <br />❑ 4. PAGERS; ❑ 5. ALARM SYSTEM; ❑ 6. PORTABLE RADIO <br />EMERGENCY COORDINATOR CONTACT INFORMATION: <br />C13. <br />PRIMARY EMERGENCY COORDINATOR NAME: Ian Andrew PHONE NO.: $147691159 PHONE NO.: 2096441916 <br />ALTERNATE EMERGENCY COORDINATOR NAME: Jordan Feneck PHONE NO.: 2096441900 PHONE NO.: 2096441912 <br />❑ Check if additional Emergency Coordinator contact and address intonation is available onsite or by calling PHONE NO.: <br />Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br />D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br />Check the applicable boxes to indicate your facility's procedures for containing spills and preventiM and mitigating releases, fires and/or explosions. <br />DI. <br />1. MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC.; <br />[12. PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, built-in berms); <br />❑ 3. PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spill pigs, spill pillows); <br />❑Q 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br />❑ 5. LINED TRENCH DRAINS AND/OR SUMPS; <br />❑� 6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br />❑9 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br />8, STOP PROCESSES AND/OR OPERATIONS; <br />❑ 9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br />10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br />❑Q 11. CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br />❑� 12. NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br />Q 13, ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br />R) 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br />❑9 15. REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br />❑ 16. HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br />❑Q 17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br />foil 18. VACUUM SUCTION USING APPROPRIATE VACUUM (e.g, Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br />0 19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br />❑Q 20. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br />ll2. <br />❑ 21. OTHER (Specify): <br />E. FACILITY EVACUATION <br />THE FOLLOWING ALARM SIGNAL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): <br />EI. <br />Es. <br />❑ 1. BELLS; <br />IN 2. HORNS/SIRENS; <br />❑� 3. VERBAL (i.e, Shouting); <br />E]4. OTHER (Specify): <br />THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e.g, Parking lot, street comer): <br />E3. <br />Fremont East Lot <br />Note: The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br />EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: <br />[11. WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />n 2. EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />❑ 3. OTHER (Specify):' <br />Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan, <br />F. ARRANGEMENTS FOR EMERGENCY SERVICES <br />ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): <br />EI' <br />[01. HAVE BEEN DETERMINED NOT NECESSARY; <br />to <br />❑ 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): <br />Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br />contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br />2 of 4 <br />