Laserfiche WebLink
7/11 MATERIALS, INC. 400 <br />WEIGHMASTER CERTIFICATE <br />• WEIGHMASTER TIHS IS TO CERTIFY that the following described commodity was weighed, measured, or <br />P.O. BOX 4770 counted by a weighmaster, whose signature is on this certificate, who is a recognized authority <br />MODESTO, CA 95352 of accuracy, as prescribed by Chapter 7 (commencing with Section 12700) of Division 5 of the <br />California Business and Professions Code, administered by the DIVISION of Measurement <br />(209) 943-4730 Standards of the California Department of Food and Agriculture. <br />SOLD TO: <br />Description <br />SHIP TO: <br />Required <br />Batched <br />SAND <br />Ticket <br />785874 <br />INDUSTRIAL AND AIRPORT, STOCKTON <br />18100 Ib <br />CEMENT <br />HOWK SYSTEMS <br />968.0 Ib <br />8712.0 Ib <br />8700.0 Ib <br />WATER <br />WATER <br />1825 YOSEMITE AVE <br />334.54 gl <br />334.57 gl <br />WATER 2 <br />WATER 2 <br />.00 % <br /># .00 gl <br />OH ENTER FROM <br />ZEPHER WEST <br />HOT WATER <br />.00 % <br />ORDER # 10 <br />.00 gl <br />Actual <br />Num Batches: <br />TIME <br />MIX NO. <br />LOAD SIZE <br />CU YD/METERS ORD'D <br />SLUMP <br />PLANT/TRANSACTION <br />TRUCK # <br />DRIVER <br />10:51 <br />0.0 gl Adjust <br />10.3SK <br />9 <br />18.00 yd <br />8.00 in <br />05 <br />4003 <br />STARR <br />SALAS <br />DATE <br />SCHEDULED ARRIVAL TIME <br />NO OF LOADS <br />ACCUM CY YD/METERS <br />ZONE <br />P.O. JOB # <br />TRUCK AHEAD <br />TICKET NUMBER <br />04/26/22 <br />1113 <br />2 <br />18.00 yd <br />S10 <br />PO 88079 <br />4038 <br />785874 <br />QUANTITY <br />CODE <br />DESCRIPTION <br />PRICE CU YD METER <br />EXTENDED PRICE <br />9.00 <br />10.3SK <br />10.3sk 2:1 yd <br />1.00 <br />6027 <br />WASH DOWN SYS -SWPPP /Q <br />1.00 <br />ENVI <br />CA CARB & ENVIRO COMP ea <br />9.00 <br />6012 <br />SURCHARGE- CEMENT Cy <br />SUBTOTAL <br />SALES TAX <br />TOTAL <br />PREVIOUS <br />STANDBY <br />2714 Stagecoach Rd, <br />WEIGHED <br />AT: Stockton, CA 95215 DEPUTY MATT HUMPHREYS <br />GRAND TOTAL <br />REV COUNT <br />ARIV JOB❑ <br />ARIV <br />PENT <br />LEFT JOB <br />JOB NOT READY ❑ TRUCK BROKE DOWN <br />❑ SLOW POUR OR PUMP ❑ ACCIDENT <br />Time Allowed <br />JOB SITE CYLINDER <br />Water <br />TEST ❑ <br />YES ❑ NO <br />LPOUR <br />❑ TRUCK AHEAD ON JOB ❑ CITATION <br />Added <br />Gals to full <br />load ❑ YES <br />t, 5 <br />❑ CONTRACTOR UNAVAIL❑ OTHER <br />❑ ADDED WATER <br />On Job <br />At <br />Customer's <br />Gals to 2/3 load ❑ YES <br />LEFT PENT <br />LEFT PLNT <br />ARIV JOB <br />Time Due <br />7't <br />V <br />./ <br />' \1") <br />Request <br />Gals to 1/3 <br />load ❑ YES <br />JOB DELAY EXPLANATION <br />Five (5) minutes per yd/meter free unloading time allowed. <br />AUTHORIZED BY: <br />FINPOUR <br />T LRDTRIP <br />@JOB <br />POUR TIME <br />Delay Time <br />Additional unloading time charged at current hourly rale. <br />NOTICE: MY SIGNATURE BELOW INDICATES THAT I ACCEPT THE TERMS AND CONDITIONS OF THIS DELIVERY TAG, INCLUDING THE TERMS AND CONDITIONS ON THE REVERSE. WE MAKE <br />DELIVERIES INSIDE CURB LINES AND ON LOTS OR PROPERTY AT CUSTOMER'S RISK ONLY AND ACCEPT NO RESPONSIBILITY WHATSOEVER FOR ANY DAMAGES RESULTING FROM SUCH DELIVERIES. <br />CUSTOMER SHALL INDEMNIFY, HOLD HARMLESS & DEFEND 7111 FOR, FROM & AGAINST ALL CLAIMS FOR DAMAGES OR PERSONAL INJURY. EXPENSE OF REMOVING MIRED TRUCK PAYABLE BY <br />CUSTOMER. WE ARE NOT RESPONSIBLE FOR THE STRENGTH, SLUMP, OR QUALITY OF ANY CONCRETE TO WHICH WATER OR ANY OTHER MATERIAL HAS BEEN ADDED AT THE BUYER'S REQUEST. <br />WE DO NOT GUARANTEE THE COLOR OF THE CONCRETE, WE HAVE NO CONTROL OVER THE PLACING, FINISHING OR CURING OF CONCRETE AND DO NOT GUARANTEE THE FINISHED WORK IN <br />WHICH IT IS USED, INCLUDING CRACKING. CONCRETE IS A PERISHABLE COMMODITY AND BECOMES PROPERTY OF THE PURCHASER UPON LEAVING THE PLANT. ANY CHANGES OR CANCELLATIONS <br />OF ORIGINAL INSTRUCTIONS MUST BE TELEPHONED TO OFFICE BEFORE LOADING STARTS. CUSTOMER IS RESPONSIBLE FOR PROVIDING A SUITABLE PLACE, ON CUSTOMER'S PROPERTY, FOR <br />DRIVERS TO WASH CHUTES AS NECESSARY. ANY CLEANUP COST OF CUSTOMER -PROVIDED WASHOUT SITE ORREMOVAL OF TRACKED -MUD FROM STREETS AND ROADS WILL BE BILLED TO <br />CUSTOMER. <br />RECEIVED BY: <br />Material <br />Description <br />Design Qty <br />Required <br />Batched <br />SAND <br />SAND <br />1936 Ib <br />18162 Ib <br />18100 Ib <br />CEMENT <br />CEMENT <br />968.0 Ib <br />8712.0 Ib <br />8700.0 Ib <br />WATER <br />WATER <br />50.00 gl <br />334.54 gl <br />334.57 gl <br />WATER 2 <br />WATER 2 <br />.00 % <br /># .00 gl <br />.00 gl <br />1901 <br />HOT WATER <br />.00 % <br /># .00 gl <br />.00 gl <br />Actual <br />Num Batches: <br />2 <br />Load <br />29592 Ib <br />Design W/C: 0.431 <br />Water/Cement: <br />0.406 A <br />Slump: <br />8.00 in # <br />Water in Truck: <br />0.0 gl Adjust <br />Water: <br />Actual W/C <br />Ratio: 0.406 <br />Actual Water: <br />423 gl Batched Cement: <br />% Var% Moisture Actual Wat <br />-0.34% 4.24% A 88 gl <br />-0.14% <br />0.01% 334.57 gl <br />Manual 10:51:26 <br />Design 450.0 gl Actual 422.7gl To Add: 27.3 gl <br />0.0 gl /Load Trim Water: -1.0 gl / CYDE <br />8700 Ib Allowable Water: 222 Ib <br />