Laserfiche WebLink
Work Plan for Interstate 5, San Joaquin County <br />Gregg Drilling will be overseeing the California Department of Transportation <br />drilling of 2 soil borings on Interstate 5 at Postmiles 38.41 and 41.07 in Lodi. The <br />borings will be drilled to a max depth of 50 -ft below ground surface using rotary <br />techniques. Soil cuttings will be contained in 55 -gal drums and removed from site <br />for disposal. The borings will be tremie grouted with neat cement from termination <br />depth to ground surface. <br />