My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014457
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
3127
>
2600 - Land Use Program
>
PA-2100214
>
SU0014457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2024 2:05:05 PM
Creation date
5/5/2022 7:55:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014457
PE
2631
FACILITY_NAME
PA-2100214
STREET_NUMBER
3127
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205-
APN
14322007, -08, -15
ENTERED_DATE
10/5/2021 12:00:00 AM
SITE_LOCATION
3127 E FREMONT ST
RECEIVED_DATE
5/3/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> PA-2100214 (SA) <br /> 3) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> 4) The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> 5) The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. The fee will be based on the current <br /> schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> 6) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7) It is the responsibility of the applicant to ensure that a current will serve letter for sanitary sewer, <br /> storm water and water service is on file prior to release of building permit. The applicant or <br /> subsequent owner of the property is responsible to ensure there is capacity in the system and that <br /> all requirements for the connections are fulfilled prior to release of the building permit. If any <br /> extension, connection, or placement of new facilities is required to connect to the existing main <br /> lines, the cost shall be borne by the applicant. For any work within the County right-of-way, an <br /> improvement plan shall be submitted to Public Works for review and approval. Required plan <br /> check and inspection fees shall apply <br /> 8) This project is a NPDES Phase I regulated area and shall comply with the following conditions. <br /> Prior to release of the building permit, plans and calculations shall be submitted and approved by <br /> the Public Works Department—Water Resources Division (209-468-3605): <br /> a) Treatment: A registered professional engineer shall design the site to treat the 85th percentile <br /> storm as defined in the County's 2021 Storm Water Quality Control Criteria Plan (SWQCCP). <br /> b) Hydromodification: A registered professional engineer shall design the site to comply with the <br /> volume reduction requirement outlined in the County's 2021 SWQCCP. <br /> c) Trash: A registered professional engineer shall design the site to comply with the trash control <br /> requirement outlined in the County's 2021 SWQCCP. <br /> 9) Prior to release of the building permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan (SWPPP) to Public Works. A copy of the approved SWPPP and all required <br /> records, updates, test results and inspection reports shall be maintained on the construction <br /> site and be available for review upon request. <br /> 10) Prior to release of the building permit, the owner shall enter into an agreement with San <br /> Joaquin County for post-construction maintenance of stormwater quality facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.