My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EQUIPMENT
>
75
>
2800 - Aboveground Petroleum Storage Program
>
PR0527663
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 1:05:46 PM
Creation date
5/5/2022 1:05:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0527663
PE
2831
FACILITY_ID
FA0018644
FACILITY_NAME
S/B SUNSTATE EQUIPMENT CO LLC
STREET_NUMBER
75
Direction
E
STREET_NAME
EQUIPMENT
STREET_TYPE
CT
City
FRENCH CAMP
Zip
95231
APN
19327017
CURRENT_STATUS
01
SITE_LOCATION
75 E EQUIPMENT CT
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r �:7 '' '' �� 'O� SAN JOAQUIN COUNTY <br />Z <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 464-3433 Web: www.sjgov.org/ehd <br />OFFICIAL INSPECTION REPORT <br />FACILITY NAME/TYPE: S/B Sunstate Equipment <br />DATE' 5/4/2022 <br />ADDRESS: 75 E. Equipment Court <br />clrY: French Camp <br />ZIP CODE: 95231 <br />OWNER/OPERATOR: Don Harcrow, Branch Manager <br />TELEPHONE #: (916) 373.0221 <br />TYPE OF INSPECTION: ❑ COMPLAINT ❑ CONSULTATION D OTHER <br />PROGRAM. 2831 <br />RECORD PR0527663 <br />NATURE OF COMPLAINT/CONSULTATION: <br />This facility has 2,840 gallons of aboveground petroleum shell capacity and is regulated under the <br />Aboveground Petroleum Storage Act (APSA). <br />Facilities with 1,320 gallons or greater of APSA regulated shell capacity must prepare and <br />implement a Spill Prevention Countermeasure & Control (SPCC) Plan. <br />OBSERVATIONS/COMMENTS: <br />This facility has an SPCC Plan on site with a date of May 23, 2018. <br />CORRECTIVE ACTIONS: <br />Maintain a current copy of the SPCC Plan on site at all times, in accordance with the California <br />Health and Safety Code Section 25270, and implement this Plan as necessary. <br />CORRECT BY: -- <br />INSPECTED BY: Gabriela Garcia-Mejla <br />RECEIVED BY: Don Harcrow, Branch Manager <br />DATE: 05/04/2022 <br />EHD 48-05 Rev. 04/19/12 INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.