My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014572
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHESTNUT
>
18551
>
2600 - Land Use Program
>
SU-86-16
>
SU0014572
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2022 4:39:21 PM
Creation date
5/10/2022 3:56:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014572
PE
2600
FACILITY_NAME
SU-86-16
STREET_NUMBER
18551
Direction
N
STREET_NAME
CHESTNUT
STREET_TYPE
ST
City
LODI
Zip
95240-
APN
01522004
ENTERED_DATE
12/8/2021 12:00:00 AM
SITE_LOCATION
18551 N CHESTNUT ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No . 2 <br /> PC : 11-20-86 <br /> SU-86-16 <br /> Page 8 <br /> Acres Maintenance District for the utility services from <br /> the time the improvements are accepted by the County to <br /> the end of the Fiscal Year , or up to a one ( 1 ) year <br /> period, as the case may be . <br /> d. Interior streets within the subdivision shall be dedicated <br /> and improved to 50-foot right-of-way public road standards <br /> (urban) . <br /> e . Chestnut Street shall be dedicated and improved on t-he. <br /> subdivided side to one-half of an 80-foot right-of-way <br /> major collector street standard and in accordance to the <br /> adopted Woodbridge Specific Road Plan. <br /> f . The developer shall pay $100 , 000 toward the construction <br /> of the southerly extension of Chestnut/Woodhaven Street <br /> and the bridge over-" the Woodbridge irrigation District <br /> Canal . Payment of the fee by the developer does not bind <br /> San Joaquin County to construct the referenced improve- <br /> ments within a specific time frame . . <br /> g . Access from Chestnut Street shall be restricted for Lot 1 <br /> through Lot 8 , and Lot 60 . <br /> h . A terminal drainage system shall be provided to meet the <br /> requirements of San Joaquin County and to provide adequate <br /> drainage for the subdivision development . The acceptance <br /> or approval by the County of the drainage system does not <br /> relieve the developer (or his engineer) of the respon- <br /> sibility of providing an adequate drainage system. The <br /> developer ' s engineer shall perform an analysis to deter- <br /> mine the adequacy of utilizing a drainage pond with <br /> metered flow to an existing 12-inch-diameter line . <br /> i . A public water system shall be provided to conform to the <br /> requirements of the Local Health District and the <br /> Department of Public Works . The system shall provide ade- <br /> quate water supply and fire hydrants for fire protection , <br /> in conformance to the requirements of the County Fire <br /> Warden and the Woodbridge Rural Fire District . <br /> j . An analysis shall be provided to justify that the Mokelumne <br /> Acres Maintenance District system is able to :service th-e <br /> development . The subdivider shall agree to construct all <br /> improvements as identified by the analysis . <br /> k . A water interconnect line shall be installed on Chestnut <br /> St: eet from Carolina Street to connect to the e:,:ist4ng <br /> waterline on Indiana Street . <br />
The URL can be used to link to this page
Your browser does not support the video tag.