Laserfiche WebLink
�� RECEIVED <br /> RACY 01/28/2021 <br />,� City <br /> of r Tray <br /> .,prnent 5anrices[3CpdrtrYtl.'.r <br /> Construction Waste Management (CWM) Plan ,ullding Safety Divisicr, <br /> Id 1_id��T; <br /> Project Name:Lowe's-Two(2)5,000 Gallon Aboveground storage Tank Removal Project- The City has a franchise agreement <br /> Permit#: 00M20-0379 that all waste goes the Tracy Delta <br /> Project Manager:Jody Rhoades(APTIM) disposal. Please contact them for <br /> Waste Hauling Company:ErlvironmentalLogistics additional information regarding your <br /> Contact Name: Jody Rhoades(APTIM) project. <br /> All Subcontractors shall comply with the project's Construction Waste Management Plan, <br /> All Subcontractor foremen shall sign the CWM Plan Acknowledgment Sheet. <br /> Subcontractors who fail to comply with the Waste Management Plan will be subject to backcharges or withholding of payment,as deemed <br /> appropriate.For instance,Subcontractors who contaminate debris boxes that have been designated for a single material type will be subject to <br /> backcharge or withheld payment,as deemed appropriate. <br /> 1. The project's overall rate of waste diversion will be 95 %. <br /> 2. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper storage and <br /> handling procedures to reduce broken and damaged materials and reusing materials whenever possible.The majority of the waste that <br /> is generated on this jobsite will be diverted from the landfill and recycled for other use. <br /> 3. Spreadsheet 1,enclosed,identifies the waste materials that will be generated on this project,the diversion strategy for each waste type <br /> and the anticipated diversion rate. <br /> 4. Waste prevention and recycling activities will be discussed at the beginning of weekly subcontractor meetings.As each new subcon- <br /> tractor comes on-site,the WMP Coordinator will present him/her with a copy of the CWM Plan and provide a tour of the jobsite to <br /> identify materials to be salvaged and the procedures for handling jobsite debris.All Subcontractor foremen will acknowledge in writ- <br /> ing that they have read and will abide by the CWM Plan. Subcontractor Acknowledgment Sheet enclosed.The CWM Plan will be <br /> posted at the jobsite trailer. <br /> 5. Salvage:Excess materials that cannot be used in the project,nor returned to the vendor,will be offered to site workers,the owner,or <br /> donated to charity if feasible. <br /> 6. environmental Logistics will provide a commingled drop box at the jobsite for most of the construction waste.These commingled <br /> drop boxes will be taken to Envlronmenlai Loglsacs . The average diversion rate for commingled waste will be 95%. <br /> As site conditions permit,additional drop boxes will be used for particular phases of construction(e.g.,concrete and wood waste)to <br /> ensure the highest waste diversion rate possible. <br /> 7. In the event that the waste diversion rate achievable via the strategy described in (6) above,is projected to be lower than what is <br /> required,then a strategy of source-separated waste diversion and/or waste stream reduction will be implemented. Source <br /> separated waste refers to jobsite waste that is not commingled but is instead allocated to a debris box designated for a <br /> single material type,such as clean wood or metal. <br /> Notes: <br /> 1. Waste stream reduction refers to efforts taken by the builder to reduce the amount of waste generated by the project to below <br /> four(4)pounds per square foot of building area. <br /> 2. When using waste stream reduction measures,the gross weight of the product is subtracted from a base weight of four(4) <br /> pounds per square foot of building area.This reduction is considered additional diversion and can be used in the waste reduc- <br /> tion percentage calculations. <br /> g, Environmental Logistics will track and calculate the quantity(in tons)of all waste leaving the project and calculate the waste diver- <br /> sion rate for the project. Environmental Logistics will provide Project Manager with an updated monthly report on gross weight <br /> hauled and the waste diversion rate being achieved on the project. Environmental Logistics monthly report will track separately the <br /> gross weights and diversion rates for commingled debris and for each source-separated waste stream leaving the project.In the event <br /> that Environmental Looglstics does not service any or all of the debris boxes on the project,the Envlronmental Logistics will work <br /> with the responsible parties to track the material type and weight(in tons)in such debris boxes in order to determine waste diversion <br /> rates for these materials. <br /> 9. In the event that Subcontractors furnish their own debris boxes as part of their scope of work, such Subcontractors shall not be <br /> excluded from complying with the CWM Plan and will provide Environmernal Logistics weight and waste diversion data for their <br /> debris boxes. <br /> 10. In the event that site use constraints(such as limited space)restrict the number of debris boxes that can be used for collection of des- <br /> ignated waste the project Superintendent will,as deemed appropriate,allocate specific areas onsite where individual material types <br /> are to be consolidated.These collection points are not to be contaminated with non-designated waste types. City of Tracy <br /> 11. Debris from jobsite office and meeting rooms will be collected by APTIM <br /> APTIM will,at a minimum,recycle office paper,plastic,metal and cardboard. O� <br /> 02/02/2021 <br /> W:1BuildinglBuilding FormslGreen Codes Forms COM20-03Z{9 ��_l <br /> Re�rsed 2123118 <br />