My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 11:02:28 AM
Creation date
5/11/2022 10:01:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6e-vL� Mowh Office Assistant <br /> San Joaquin County Environmental Health Department <br /> 1868 E . Hazelton Ave . Stockton , CA 95205 <br /> GM ( 209 ) 468 - 021718 ( 209 ) 468- 3433 12 gmartinez@slgov . org <br /> EHD Website : https : //www . sagov . org/department/envhealth / <br /> From : Colgan , Sam <Samuel . Colgan@arcadis . com > <br /> Sent : Monday, November 30, 2020 2 : 34 PM <br /> To : EH - UST < ust@sigov . org> <br /> Subject : UST Fuel Conversion - UPS Stockton <br /> CAUTION : This email is originated from outside of the organization . Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe . <br /> Hello, <br /> Please see the attached permit application for our fuel conversion project at UPS Stockton . The facility is located at <br /> 1532 N Broadway Ave, Stockton , CA . <br /> UPS would like to convert their existing 10, 000-gallon diesel UST back to gasoline . The tank was originally installed as a <br /> gasoline UST, so it already has Phase 1 / 11 components under EO VR- 102 and VR-203 . Our work includes confirming <br /> existing Phase 1 / 11 components, modifying components ( e . g . , tank probe, vent riser cap ) , testing and repairing electrical <br /> wiring, and bringing labels up to current codes . <br /> I ' ve attached : <br /> • Permit app <br /> • Payment receipt <br /> • ( 2 ) Site maps <br /> • Diesel -to -gasoline fuel conversion construction guidelines <br /> • New components list ( as needed , our tech will verify existing Phase 1/ 11 equipment prior to the start of work ) <br /> Let me know if you have any comments or questions . <br /> Thanks, <br /> Sam <br /> Sam Colgan Environmental Engineer 2 Samuel . Colgan@arcadis . com <br /> Arcadis U . S . , Inc . 320 Commerce , Suite 200 Irvine, CA 92602 <br /> D : 714-508-2622 M : 484-947 - 3653 <br /> Connect with tis ! www. arcadis . com I Liirlkedln 1 twitter I Facebook <br /> POARCADIS <br /> a; Please consider the environment before printing this email <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.