My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2023 11:09:34 AM
Creation date
5/11/2022 10:45:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
76 GAS STATION
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for MARCH AND BIANCHI INC as of May 10, 2022. <br /> Open violations from November 30, 2021 inspection <br /> Violation#304-Failure to construct,operate,and maintain primary containment as product-tight. <br /> OBSERVATION: Little amounts of oil was observed in under dispenser containment sump (UDCs)7/8, 9/10 and <br /> 11/12 indicating a leak in the primary containment. <br /> REGULATION GUIDANCE:All primary containment for the UST system must be product tight. <br /> CORRECTIVE ACTION: Immediately have a properly licensed,trained, and certified contractor repair or replace the <br /> failed component(s), under permit and inspection of the EHD if necessary. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#315-Failure to maintain interstitial space to detect leaks before release to environment(post-Jul <br /> 2004). <br /> OBSERVATION: The diesel smart sensor failed when tested. <br /> REGULATION GUIDANCE: The interstitial space of the UST shall be maintained, as designed, under constant <br /> vacuum or pressure such that a breach in the primary or secondary containment is detected before the hazardous <br /> substance is released into the environment. <br /> CORRECTIVE ACTION: Correct immediately by having a properly licensed,trained, and certified contractor replace <br /> the failed component with a functional component(LG 113-x listed, if applicable), and obtain a permit within one <br /> business day from the EHD, if needed. If the failed component can't be replaced immediately,there is a possibility <br /> that the [GRADE] UST system may be red tagged to prevent fuel inputs. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Open violations from November 19, 2021 inspection <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.