Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for MARCH AND BIANCHI INC as of May 10, 2022. <br /> Open violations from November 19, 2021 inspection <br /> Violation#122-Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION:An inspection was last done on 11/19/2020 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 12/19/2020. This information has not been received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#205-Failure to have current UST Monitoring Plan readily accessible at the facility. <br /> OBSERVATION:An approved copy of the monitoring plans were not available for inspection. <br /> REGULATION GUIDANCE:A copy of these plans shall be accessible on site at all times. <br /> CORRECTIVE ACTION: Immediately locate and retain a copy on site. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#206-Failure to have a current UST Response Plan available on site. <br /> OBSERVATION:An approved copy of the response plan was not available for inspection. <br /> REGULATION GUIDANCE:A copy of this plan shall be accessible on site at all times. <br /> CORRECTIVE ACTION: Immediately locate and retain a copy on site. <br /> Page 3 of 4 <br />