My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2023 11:09:34 AM
Creation date
5/11/2022 10:45:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
76 GAS STATION
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 5. MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System Certification Form must be prepared for each control panel <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder Root TLS 350 332.00 <br /> Attach the post-certification reports if the Monitoring System is capable of Yes No NA <br /> generating either,- N Monitoring System Set-Up N Alarm History Report <br /> All monitoring equipment is operational per manufacturer's specifications? N ❑ <br /> Secondary containment systems are free of damage, debris, or liquid? N ❑ <br /> Are the audible and visual alarms operational? N ❑ <br /> All sensors have been: 1) visually inspected for wiring kinks, breaks and residual N ❑ ❑ <br /> buildup on floats; and 2) tested for functionality and confirmed operational? <br /> Are all sensors installed to detect a release at the earliest opportunity in the N ❑ ❑ <br /> secondary containment? <br /> The monitoring system setup was reviewed, and proper settings confirmed? N ❑ ❑ <br /> Was the monitoring control panel's backup battery visually inspected, <br /> functionally tested, and confirmed operational? ® El El <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- N ❑ ❑ <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system fails to operate or is electrically disconnected? ® El El <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system detects a release? Which sensors initiate positive shutdown? N ❑ ❑ <br /> Check all that apply) N Sump N UDC <br /> If monitoring system alarms are relayed to a remote monitoring center, is all ❑ ❑ N <br /> communication equipment operational? <br /> Describe all answers marked "No"or "Fail"and proposed remedy in Section 9. <br /> List all Monitoring equipment either replaced or repaired in Section 9. <br /> Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.