My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2023 11:09:34 AM
Creation date
5/11/2022 10:45:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
76 GAS STATION
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" s "; i - CSO <br /> 5 . MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System Certification Form must be prepared for each control panel. <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder Root TLS 350 332 . 00 <br /> Attach the post-certification reports if the Monitoring System is capable of Yes No NA <br /> generating either; ® Monitoring System Set- Up ® Alarm History Report <br /> All monitoring equipment is operational per manufacturer' s specifications ? ® ❑ <br /> Secondary containment systems are free of damage , debris , or liquid ? ® ❑ <br /> Are the audible and visual alarms operational ? ® ❑ <br /> All sensors have been : 1 ) visually inspected for wiring kinks , breaks and residual ® ❑ ❑ <br /> buildup on floats ; and 2 ) tested for functionality and confirmed operational ? <br /> Are all sensors installed to detect a release at the earliest opportunity in the ® El ❑ <br /> secondary containment? <br /> HP <br /> The monitoring system setup was reviewed , and proper settings confirmed ? ® ❑ ❑ <br /> Was the monitoring control panel ' s backup battery visually inspected , <br /> functionally tested , and confirmed operational ? ® El ❑ <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- ® ❑ ❑ <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment ® ❑ ❑ <br /> monitoring system fails to operate or is electrically disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system detects a release ? Which sensors initiate positive shutdown ? ® ❑ ❑ <br /> Check all that apply) ® Sump ® UDC <br /> If monitoring system alarms are relayed to a remote monitoring center , is all ❑ ❑ <br /> ED <br /> communication equipment operational ? <br /> Describe all answers marked 'ft " or "Fail" and proposed remedy in Section 9 . <br /> List all Monitoring equipment either replaced or repaired in Section 9 . <br /> Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.