Laserfiche WebLink
" s "; i - CSO <br /> 5 . MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System Certification Form must be prepared for each control panel. <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder Root TLS 350 332 . 00 <br /> Attach the post-certification reports if the Monitoring System is capable of Yes No NA <br /> generating either; ® Monitoring System Set- Up ® Alarm History Report <br /> All monitoring equipment is operational per manufacturer' s specifications ? ® ❑ <br /> Secondary containment systems are free of damage , debris , or liquid ? ® ❑ <br /> Are the audible and visual alarms operational ? ® ❑ <br /> All sensors have been : 1 ) visually inspected for wiring kinks , breaks and residual ® ❑ ❑ <br /> buildup on floats ; and 2 ) tested for functionality and confirmed operational ? <br /> Are all sensors installed to detect a release at the earliest opportunity in the ® El ❑ <br /> secondary containment? <br /> HP <br /> The monitoring system setup was reviewed , and proper settings confirmed ? ® ❑ ❑ <br /> Was the monitoring control panel ' s backup battery visually inspected , <br /> functionally tested , and confirmed operational ? ® El ❑ <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- ® ❑ ❑ <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment ® ❑ ❑ <br /> monitoring system fails to operate or is electrically disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system detects a release ? Which sensors initiate positive shutdown ? ® ❑ ❑ <br /> Check all that apply) ® Sump ® UDC <br /> If monitoring system alarms are relayed to a remote monitoring center , is all ❑ ❑ <br /> ED <br /> communication equipment operational ? <br /> Describe all answers marked 'ft " or "Fail" and proposed remedy in Section 9 . <br /> List all Monitoring equipment either replaced or repaired in Section 9 . <br /> Page 2 of 9 <br />