My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2023 11:09:34 AM
Creation date
5/11/2022 10:45:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
76 GAS STATION
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> ® Check this box if in-tank gauging is used only for inventory control. <br /> ❑ Check this box if NO tank gauging equipment is installed. Yes No NA <br /> (Do not complete this section if either box is checked.) <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and ❑ ❑ ❑ <br /> termination; and 2) tested for ground faults <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup ❑ ❑ ❑ <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ 1 ❑ ❑ <br /> Probe /D Probe Model Tank Monitored Pass Fail <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> 9. COMMENTS <br /> 11/30/2021 - S6 product vac failed in high liquid. Will need to return to replace and retest. <br /> 12/30/2021 - Replaced S6 product vac sensor. Retested and passed. <br /> Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.