Laserfiche WebLink
Tank Sump Manual enviro,n-� <br /> 7. BASE/RISER CONNECTIONS 8.1 Polyethylene Riser Fabrication <br /> Using a saber saw,the riser can be cut to the desired height by cutting <br /> For both deep and extended burial tank in the valley of two ribs. All cuts should be even,and if necessary,all <br /> sumps which have separate base andedges cleaned with a razor knife or a plastic de-burring tool. Make sure <br /> riser sections, it is necessary to follow there is enough riser left to extend into the skirt of the street manhole <br /> the assembly instructions for proper so that the bottom of the street manhole skirt does not interfere with <br /> installation of each combination of joint. the top sump base. <br /> 8.2 Fiberglass Riser Fabrication <br /> Measure down from the top of the riser to the desired height and place <br /> 7.1 Polyethylene Riser a mark on the riser. Using a flexible tape,draw a line connecting the <br /> Begin assembly by placing the sump riser section on top of the sump <br /> marks.With a saber saw,cut along the perimeter of the riser.Be sure base flange. From inside the sump, position one compression ring to de-burr all the edges after cutting. <br /> section on the riser flange and another underneath the base flange. IMPORTANT:Leave a minimum of 3"of sump riser to allow for <br /> proper clearance of the sump cover. <br /> Secure the two ring sections by loosely installing the fasteners into the <br /> bolt holes. Continue this same procedure until all segments of the <br /> compression ring have been installed and secured. Tighten all RISER/COVER SEAL <br /> fasteners to 60 inch pounds using a torque wrench. 9 <br /> IMPORTANT: Always store riser sections with the flange After the riser has been cut to the <br /> side up to prevent damage to the gasket during site appropriate burial height, the cover <br /> storage. Sump base flange and gasket must be clean seal should be installed to the top of <br /> s : <br /> and free of debris prior to assembly. the riser. A tube of adhesive is y <br /> rte.. <br /> provided to bond the cover seal to { <br /> the top of the riser. Apply the <br /> 7.2 Fiberglass Riser adhesive entirely around the seal <br /> Prior to installing a fiberglass riser to a fiberglass base, it is area of the riser, both inside and out. <br /> necessary to rough sand the entire outside diameter of the riser Then smooth out the adhesive so <br /> (the portion which will sit inside the collar of the base) as well that it evenly covers the entire area. <br /> Allow to set for ten minutes. Next,install the cover seal over the <br /> as the entire inside diameter of the base collar,with a heavy grit <br /> sandpaper. This removes any oxidation, grease or grime, riser edge and position it evenly into the riser edge. Once <br /> creating suitable bonding surface for the resin kit.Once this has <br /> installed, inspect around the entire diameter for evenness. <br /> been completed, carefully insert the riser into the base collar <br /> making sure it is evenly positioned. <br /> 10. PIPE ENTRY LOCATIONS <br /> 4 <br /> 7.2.1 Preparing the adhesive For standard pipe burial applications, - <br /> the piping should enter at the lowest <br /> Refer to the fiberglass adhesive mixing instructions in section the adhesive possible entry point in the sump. For <br /> 6.2.3 for proper preparation of the adhesive.After determining the correct pipe entry <br /> has been properly mixed, prepare to apply the adhesive to the <br /> location for tank sumps, refer to the <br /> overlap joint from outside the sump. <br /> GeoFlex®piping manual. Refer to the � <br /> flexible entry boot manual for the <br /> 7.2.2 Applying the adhesive proper installation of all pipe entries. <br /> Using a plastic knife, liberally apply the adhesive into the <br /> overlap groove. Continue to apply adhesive evenly around the <br /> entire perimeter of the joint. Make sure the entire overlap joint <br /> vTANK SUMP BACKFILL MATERIALS <br /> is filled completely to avoid any potential leak areas.Scrape the 11 <br /> top of the joint clean using the plastic knife. Adhesive should <br /> fully cure at ambient temperature of 70°F- 100°F in 24 hours. IMPORTANT: Prior to backfilling around the tank sump, <br /> make sure the sump cover has been installed to <br /> prevent any deformation of the riser during backfilling. <br /> S. RISER HEIGHT FABRICATION <br /> Approved backfill materials for tank sumps shall meet t e <br /> The riser sections of tank sumps have following specifications: <br /> structural ribs which are two inches on <br /> center. 11.1 Pea Gravel <br /> Rounded pea gravel is permitted with <br /> a minimum diameter of 1/8" and a <br /> maximum diameter of 3/4". <br /> 8 <br />