Laserfiche WebLink
11. Please include a copy of any studies ( soils , geology, marketing, <br /> that you may have had prepared for this project or project <br /> Smote. <br /> C . PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service . <br /> a . Water Supply: ' CALIF. WATER- SERUICE <br /> b. Sewage Disposal : ERST STOCKrW SE1JEr- <br /> c . Storm Drainage: ROAD SIDE D ITC H <br /> If an extension of anv of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service(s ) , and the distance of the extension( s ) : <br /> d. Natural Gas • P. . CY E - <br /> e . Electricity: . &. S- E . <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> PAVED PUBLIC 4 FILBERT" ST. <br /> g . Fire: Distance to nearest fire station: <br /> h . Schools: S►acK-ToK) UNI FI IFD <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures , number of trees removed, etc. ) . <br /> NONE <br /> 3 . Air .Quality Information: <br /> Number and type of vehicles associated with completed project <br /> FAMIUY Cf�(z5 <br /> Types of emissions and sources associated with project <br /> FUD ES FIZDM BOME, FUKNACES C EXIST rK(,% <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project VACUSES E)(ISTING= <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? XNO YES <br /> 4 . How much agricultural land will be removed from production? <br /> NONE <br /> Irrigated Not irrigated <br /> Minor Subdivision - 9 - ( 6/86 ) <br />