My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALLEJO
>
11285
>
2200 - Hazardous Waste Program
>
PR0531091
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 12:17:14 PM
Creation date
5/16/2022 9:26:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0531091
PE
2220
FACILITY_ID
FA0010960
FACILITY_NAME
Herc Rentals Inc (9731-00)
STREET_NUMBER
11285
STREET_NAME
VALLEJO
STREET_TYPE
CT
City
FRENCH CAMP
Zip
95231
APN
19338001
CURRENT_STATUS
01
SITE_LOCATION
11285 VALLEJO CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1.3 Staff shall be trained within six months of hire or starting a new position at this Facility,or be <br /> supervised by trained staff until that time.Refresher training shall be conducted annually and <br /> properly documented. <br /> 3.1.4 Staff shall have thorough knowledge and training prior to the use of Facility aerosol puncture <br /> equipment.Staff shall review all manufacturer operation manuals prior to processing cans to <br /> become familiar with equipment design,operation,and maintenanemaintenance.e,,moo^D^D <br /> 4. Safety precautions <br /> 4.1 Training <br /> 4.1.1 Prior to sorting,managing,or preparing HW for highway transport,staff shall complete <br /> Hazardous Categorization,Occupational Safety and Health Administration(OSHA),and <br /> DOT(or equivalent)trainings.Refresher training shall be conducted annually. <br /> 4.1.2 Staff shall be trained within six months of hire or starting a new position or shall be <br /> supervised by trained and experienced staff,;see SOP 2.a Employee Right T, V...... <br /> 4.1.3 Staff responsible for any aspect of hazardous waste management shall be trained relevant to <br /> job duties,including contingency plan implementation.;see SOP-s 2.1 n M R and 2.10 Hii <br /> Gonfingeney Plait. <br /> 4.1.4 Only trained Facility staff shall manage abandoned or unknown waste.Staff shall be trained <br /> on personal protective equipment(PPE)use and requirements.Staff shall also be trained to <br /> respond to spills in accordance with the HHW program and state agency contract.See cam,.«,... <br /> 4.2 of this SOP and SOP 2.6 Spill Respenfe- <br /> 4.2 Personal protective equipment(PPE)requirements <br /> This Program may choose to implement a more restrictive PPE policy,as engineered solutions to <br /> environmental conditions and experienced staff judgment shall be used for unique conditions and <br /> situations.PPE shall be utilized if the potential for exposure remains after the institution of work <br /> practice controls_;see c^D 2.4 PersenalPrateetive E,.uipm,._,.At a minimum,the following PPE <br /> shall be used while processing aerosols: <br /> • Safety glasses with side shields,goggles,or equivalent eye protection <br /> • Face shield <br /> • Footwear with reinforced toe or toe caps or equivalent foot protection <br /> • Nitrile gloves or equivalent hand protection <br /> • Chemical splash apron,Tyvek coveralls,or equivalent <br /> • Respirator use(If Facility has respirator program, °^D o c D <br /> 4.6 Aerosol Can Puncturing Procedures 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.