My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 11:00:31 AM
Creation date
5/17/2022 7:48:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO 07147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Spill Container Testing Report Form <br /> 6. SPILL CONTAINER DETAILS <br /> Test Method Developed by Manufacturer V/ Industry Standard Professional Engineer <br /> Test Type Pressure Vacuum r/ Hydrostatic <br /> Tank ID 87 Fill 91 Fill DSL Fill <br /> Spill Container Manufacturer: oPw oPw oPw <br /> Method of Cathodic Protection <br /> QNonmetallic ZNonmetallic �( Nonmetallic Nonmetallic <br /> ❑Other Other Other ❑Other <br /> Is the spill container minimum ,✓❑Yes ✓❑Yes ❑✓ Yes ❑Yes <br /> capacity five gallons excluding <br /> riser volume? ❑No* ::1 No* ❑No* ❑No* <br /> Method to keep spill container ❑✓ Drain _✓j Drain ! Drain ❑Drain <br /> empty ❑Pump Pump ❑Pump ❑Pump <br /> Other Other Other Other <br /> Spill Container Test Results ✓ Pass [Z]Pass Pass [—]Pass <br /> ❑Fail Fail ❑Fail I[-_-]Fail <br /> Tank ID 87 vapor 91 vapor <br /> Spill Container Manufacturer: oPw oPw <br /> Method of Cathodic Protection F7 Nonmetallic QNonmetallic HNonmetallic LjNonmetallic <br /> Other =Other ❑Other =Other <br /> Is the spill container minimum ❑✓ Yes ✓❑Yes Yes ❑Yes <br /> capacity five gallons excluding ❑No* [:]No* ❑No* [:]No*riser volume? <br /> Method to keep spill container ❑Drain DrainDrain rain <br /> empty [Z]Pump [Z]Pump ❑Pump EJPump <br /> Other Other ❑Other they <br /> Spill Container Test Results ✓❑Pass ✓ ass Pass Pass <br /> �OFail ail F7FaiI [Tail <br /> B. COMMENTS <br /> Describe all answers marked"'Other," "No,"or "Fail"and each proposed remedy. <br /> * Mark here if: <br /> Spill containers do not have a minimum capacity of five gallons and require replacement. <br /> Additional copies of this page may be attached. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.