My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 11:00:31 AM
Creation date
5/17/2022 7:48:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO 07147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix 8 <br /> 71 SO Overfill Valve in Tank Shut off level Worksheet <br /> important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> ma idai riffs riRti6ns. All eng measurements ar n-jnc%i , Please contact the Authority Having Jurisdic- <br /> tion(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled In the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube, <br /> (D)= 5 q,3/6 <br /> Distance from the 71 SO Inlet tube flange to the top and <br /> bottom off?Dertube,valve length. (R) <br /> (ilii)_ <br /> (U) Upper <br /> Tube <br /> Distance from the 71 SO Inlet tube flan a the bottom <br /> of the tank. Note:if a tank bo rote or is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 &61TP models add 0.6") <br /> (B)= 132 Le_ ( Valve <br /> Length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number(Y)which corresponds <br /> to the 100%volume. (8} <br /> (Y) To Tank <br /> I. To determine shut-off percentage: (Y) <br /> Subtract upper tube length(D)from distance to tank <br /> (U)Valve Tank <br /> bottom(B) , Length, Chart <br /> (K)=(B)-(D)-2"_ l a t top of cut Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> Manufacturer determine the tank capacity at the cal- <br /> culated M dimension and the 100%volume(Y}tank � <br /> capacity.- <br /> " <br /> (X)tank capacity in gallons= <br /> (Y)tank capacity In gallons <br /> SO%=(X)capacity/(Y)capacity x100 <br /> Note: The overfill valve must be installed per ARJ require- <br /> ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve muss be removed and replaced. For <br /> reference 90 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum ofgs%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.