Laserfiche WebLink
SAN J O A Q U I N Environmental Health Department <br /> COUNTY Jasjit Kang , RENS , Director <br /> NP <br /> � �Foa� Greatness g <br /> rows here . <br /> Muniappa Naidu , RENS , Assistant Director <br /> " <br /> PROGRAM COORDINATORS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Steven Shih REHS <br /> Michelle Henry , REHS <br /> Elena Manzo , REHS <br /> December 28 , 2022 <br /> MERLIN BOWEN <br /> GETTLER- RYAN , INC . <br /> 6805 SIERRA COURT SUITE G <br /> DUBLIN , CA 94568 <br /> mbowen ( grinc . com <br /> Re : ARCO 07147 SR0086129 <br /> 1206 E MARCH LN <br /> STOCKTON , CA 95210 <br /> The San Joaquin County Environmental Health Department ( EHD) has completed the review of the <br /> application for a permit to do the following on the underground storage tank ( UST) system at the <br /> above- noted address : <br /> • Replace (3) turbine sump manway lids <br /> • Replace (3) leak detectors <br /> • Replace (6) dispensers with conversion frames and deflector plates installation <br /> • Cold start the monitoring panel <br /> The permit has been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work . All new addenda supersede the previous ones . <br /> 3 . Provide written notification to ust( sigov . org to arrange the following inspection appointments <br /> ( a 48- hour notice is required for inspection appointments ) . <br /> a . Sensor functionality : Functionality of the monitoring system must be verified to ensure that <br /> monitoring has been restored to meet the requirements of Title 23 California Code of <br /> Regulations and the Health & Safety Code . A copy of the alarm history shall be printed <br /> prior to performing the cold start of the monitoring panel , and made available at the time of <br /> EHD inspection . <br /> b . Leak detector test : Leak detector must be tested to confirm that the device can detect a <br /> leak of 3 gallons per hour at 10 psi . <br /> c . Verification of the dispenser footprints contained by the under dispenser containment <br /> sumps ( UDCs ) . Any potential leaks from piping and fuel filters must drain directly into <br /> UDCs . <br /> d . Visual inspection of the piping within the dispensers <br /> e . Since concrete will be broken near the tanks , a secondary containment test must be <br /> performed on the 87 , 91 , and diesel turbine sumps and tanks once the concrete is poured <br /> in accordance with the manufacturer' s guidelines <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468 -3420 1 F 209 464-0138 1 www , sjgov . org/ehd <br />