My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 11:00:31 AM
Creation date
5/17/2022 7:48:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO 07147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I N Environmental Health Department <br /> COUNTY <br /> UST SYSTEM RETROFIT OR REPAIR <br /> ( Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed ? YES [ ] NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the " Site Health and Safety Plan " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements . If repairing a component , describe <br /> how this will be done . ( If adding piping , LIDC ' s , or other UST equipment , or performing tank top upgrade , <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review) : <br /> Remove and replace existing dispensers and hanging hardware with new dispensers/hanging hardware <br /> with new conversion frames and deflector plates . Remove and replace existing manway covers with new manway <br /> lids . Remove and install existing turbines/PLLD with new F . E . Petro turbines and PLLD with new Petro Mag VFC <br /> frequency controllers and FE Petro STP - DHI dispenser hook isolation box <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third-party approval) : <br /> Wayne Ovation dispensers 2@3 + 1 , 2@3 + 0 and 2@3 + 0 single sided <br /> Fiberlite 40 " turbine manway covers <br /> FE Petro 2hp turbines with PLLD w/o swift checks <br /> Gasoline Dispenser hose kits (VST 5 ' hose , VST 8 ' hose , VST balance nozzles , Emco breakaways ) <br /> Diesel dispensere hose kits (VST -6 ' hose , VST4 hose , OPW nozzle , breakaway , swivel and clamp ) <br /> FE Petro Mag VFC variable frequency controllers with dispenser hook isolation box <br /> 5 . Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal ? YES [ ] NO [ ] <br /> b . Identify contractor performing decontamination : <br /> Name Phone (� <br /> Address P City Zip <br /> 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.