My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 11:56:13 AM
Creation date
5/17/2022 4:55:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: Incon <br /> Sump/UDC ID 87 STP 91 STP Diesel STP <br /> Sump Manufacturer Unknown (FRP) Unknown (FRP) Unknown (FRP) <br /> Sump Depth (inches) 47 47 49 <br /> Sump Bottom to Top of 21 22 22 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:58 11:58 11:31 <br /> Initial Reading 5.2925 6.8449 5.6756 <br /> Test End Time 12:14 12:14 11:46 <br /> Final Reading 5.2926 6.8432 5.6753 <br /> Change in Reading 0.0001 -0.0017 -0.0003 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 <br /> Tightness Test Results El Pass rl Fail © Pass rl Fail r Pass © Fail [Cl Pass 0 Fail <br /> Sump/UDC ID UDC#1-2 UDC#3-4 UDC#5-6 <br /> Sump Manufacturer Bravo (Steel) Bravo (Steel) Bravo (Steel) <br /> Sump Depth (inches) 9 9 9 <br /> Sump Bottom to Top of Bottom Bottom Bottom <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 14:05 14:05 12:36 <br /> Initial Reading 0.4617 0.5443 0.6312 <br /> Test End Time 14:20 14:20 12:35 <br /> Final Reading 0.4623 0.5449 0.6309 <br /> Change in Reading 0.0006 0.0006 0.0003 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 <br /> Tightness Test Results © Pass 0 Fail © Pass 0 Fail 0 Pass © Fail I! Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.