Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: Incon <br /> Sump/UDC ID 87 STP 91 STP Diesel STP <br /> Sump Manufacturer Unknown (FRP) Unknown (FRP) Unknown (FRP) <br /> Sump Depth (inches) 47 47 49 <br /> Sump Bottom to Top of 21 22 22 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:58 11:58 11:31 <br /> Initial Reading 5.2925 6.8449 5.6756 <br /> Test End Time 12:14 12:14 11:46 <br /> Final Reading 5.2926 6.8432 5.6753 <br /> Change in Reading 0.0001 -0.0017 -0.0003 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 <br /> Tightness Test Results El Pass rl Fail © Pass rl Fail r Pass © Fail [Cl Pass 0 Fail <br /> Sump/UDC ID UDC#1-2 UDC#3-4 UDC#5-6 <br /> Sump Manufacturer Bravo (Steel) Bravo (Steel) Bravo (Steel) <br /> Sump Depth (inches) 9 9 9 <br /> Sump Bottom to Top of Bottom Bottom Bottom <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 14:05 14:05 12:36 <br /> Initial Reading 0.4617 0.5443 0.6312 <br /> Test End Time 14:20 14:20 12:35 <br /> Final Reading 0.4623 0.5449 0.6309 <br /> Change in Reading 0.0006 0.0006 0.0003 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 <br /> Tightness Test Results © Pass 0 Fail © Pass 0 Fail 0 Pass © Fail I! Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />