Laserfiche WebLink
Il. Please include a copy of any studies (soils , geology, marketing, <br /> etc. ) that you may have- had prepared for this project or project- <br /> s; <br /> te. <br /> C. PROJECT CHARACT:?RISTICS <br /> 1. Services: Indicate how the: following services will be provided <br /> for your project and availability of service. <br /> a. Water Supply: California Water Service Co. <br /> b. Sewage Disposal: CSA 4i5 <br /> C . Storm Drainage: S. and S .J. Irri?ation District <br /> if an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service(s ) , -and the distance of the extension(s ) :a) Extension of <br /> f .g'-Water line at ?4-colli Road; b) Tie-in to sewer line at HiQ_hwav 88 ; <br /> c) Tie-in to pond between Cer?ro and Anhausier-Bus e <br /> d. Natural Gas : P G & E <br /> e. Electricity: P G & E <br /> f . Road/Access ( i .e. , paved, unpaved, public/private, road name) : <br /> Wilcox Road Extension <br /> g. Pire:Waterloo-Morada0istance to nearest fire station: = 5 miles <br /> h. Schools: Waterloo School <br /> � <. Describe any site alterations which result from the proposed pro— <br /> ject (specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of t=ees removed, etc. ) . <br /> No maicr grade changes will occur <br /> Air Quality Inf ormation: <br /> Number and type of vehicles associated with completed project <br /> N/A <br /> Types of emissions and sources associated with project N/A <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project N/A <br /> Will the project result in substantial air emissions or deteriora— <br /> tion of ambient air quality? % NO V-L-S <br /> 4 . flow much agricultural land will be removed from production? <br /> 35. 67 acres <br /> _-raated Not irricatec Y <br /> g _ <br /> (6/86 ) <br />