Laserfiche WebLink
500 E Louise Ave <br /> Lathrop, San Joaquin County -4 - 12 April 2019 <br /> nature of the subsurface conditions. While staff have reviewed and approved <br /> numerous work plans and reports for the site, the Berlogar Stevens &Associates <br /> geotechnical report does not appear to have been included in documents <br /> submitted to the Site Cleanup Section overseeing the remediation and <br /> redevelopment of the site since early 2015. Several other geotechnical <br /> investigations have been conducted at the site since 2015 that provide the Site <br /> history of waste management practices that have the potential to negatively <br /> impact human health and the environment as well as regulatory expectations <br /> regarding handling, characterization, and disposal of unpermitted waste material <br /> illegally landfilled at the site. Staffs of the Central Valley Water Board and <br /> SJCEHD have approved an extensive Site Assessment Report and Clean <br /> Closure Plan for other sections of the site that is not referenced in the SWPPP. In <br /> addition, the Excavation and Materials Management Plan (9 March 2018, Brusca <br /> Associates) was developed and implemented at the Site for WU1 that extended <br /> across part of Parcel B and the Site. <br /> h. Open trenching along the length of the large building located on the northeastern <br /> part of the Site contained 10-inch diameter blue vinyl piping (Figure 17 of <br /> Attachment 3). The northeastern most side of the open trench had a strong odor <br /> emanating from it and staining was also observed in the soil profile as shown in <br /> Figures 15 and 16 of Attachment 3. The trenching placement is in the vicinity of <br /> the diesel spill site and may have disturbed material from that historical spill and <br /> ongoing cleanup. <br /> i. There was significant onsite storage of materials located in the area of earthwork <br /> as shown in Figures 19 and 20 of Attachment 3. Dates written in black marker on <br /> the plastic wrap varied from February 2019 through March 2019. <br /> j. Glass manufacturing waste material is present on the surface across the eastern <br /> portion of the site combined with the observed new waste pile indicate that the <br /> remainder of the Site must be investigated for the presence of waste pits and the <br /> potentially negative impacts to water quality (Figures 21 and 22). <br /> k, A lone pouch style container without labeling was present along a fence situated <br /> on the Parcel B side of Parcel A as shown in Figure 23 of Attachment 3. The <br /> container appeared to be empty with no staining visible on the ground through <br /> the surrounding foliage. <br /> 6. The Discharger's failure to submit a work plan for approval with or notify Central Valley <br /> Water_Board staff that glass manufacturing waste were found during construction <br /> earthmoving activities has resulted in the issuance of this Request for Information <br /> pursuant to Water Code section 13267, which authorizes the Executive Officer of the <br /> Central Valley Water Board to issue orders requiring submittal of technical reports for the <br /> suspected release of pollution. <br /> 7. In order to ensure protection of human health and the environment at the subject property, <br /> Central Valley Water Board staff have concluded that information is necessary regarding <br /> operations conducted on the property, including locations and extents of waste pits in <br /> which the observed waste material in Attachment 3 was obtained from, characterization of <br /> the excavated waste, soil sampling from beneath the waste pits, handling procedures, <br />