My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
CORRESPONDENCE_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:12:51 PM
Creation date
5/20/2022 11:54:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2019
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Field, Cheryl [EHD] <br />From:McClellon, Robert [EHD] <br />Sent:Thursday, April 21, 2022 2:59 PM <br />To:Field, Cheryl [EHD] <br />Subject:FW: San Joaquin Cogen Site Assessment Work <br /> <br /> <br />From: Brian W. Millman <bmillman@advgeoenv.com> <br />Sent: Friday, February 22, 2019 9:59 AM <br />To: Robert McClellon [EH] <RMcClellon@sjcehd.com> <br />Subject: RE: San Joaquin Cogen Site Assessment Work <br /> <br />Hi Robert, I hope all is well. <br /> <br />I want to make sure I confirm a couple of items with you and get on the calendar for the site <br />assessment in March at Cogen (17200 Murphy Parkway). We discussed the dates the work is <br />scheduled during the meeting at the Regional Board that you were on the phone for. But I hadn’t <br />contacted you directly since then. The work is scheduled for March 11 through 15, 2019. We will <br />require grout inspection at the end of each day. Grouting each day shouldn’t require too much time, <br />each boring will be to 15 feet so grouting will be quick. Will you please put us on the <br />schedule/calendar for those dates? <br />I will submit the permit application and fees to your office on Monday, I will drop them off myself. I will <br />also include the service agreement, work plan/and approval letter, and H&S Plan. Will you please <br />confirm the total price for me for the work plan review and to install 24 borings and 4 monitoring wells. <br />I just want to be crystal clear about the cost so I can request one check. <br /> <br />Thanks Robert! <br /> <br /> <br />Brian W. Millman, P.G. <br />Senior Geologist <br />CA Professional Geologist No. 8574 <br />CA QSP/QSD No. 26882 <br />Advanced GeoEnvironmental, Inc. <br />Environmental • Compliance • Industrial Hygiene • Geotechnical <br />Phone: 800-511-9300 <br />Fax: 888-445-8786 <br />bmillman@advgeoenv.com <br />www.advgeoenv.com <br /> <br />“Working in Partnership with People, Business and the Environment”
The URL can be used to link to this page
Your browser does not support the video tag.