My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
CORRESPONDENCE_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:12:51 PM
Creation date
5/20/2022 11:54:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2019
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />From: Brian W. Millman <bmillman@advgeoenv.com> <br />Sent: Friday, March 22, 2019 3:41 PM <br />To: Palmer, Ann@Waterboards <Ann.Palmer@waterboards.ca.gov>; Robert McClellon [EH] <RMcClellon@sjcehd.com>; <br />Linda Turkatte (lturkatte@sjcehd.com) <lturkatte@sjcehd.com> <br />Cc: 'Dana Parry' <danap@reynoldsandbrown.com>; Joe Brusca <jbrusca@bruscaassociates.com>; Robert Marty <br /><rmarty@advgeoenv.com> <br />Subject: Pilkington - 500 E Louise Ave, Lathrop- WU1 excavation and removal <br /> <br />Hello Ann and Linda, <br /> <br />Soil excavation and removal of wastes from WU1 at 500 East Louise Avenue, Lathrop began on <br />Monday 18 March 2019. Field activities to remove the soil cap and glass cullet beneath the cap were <br />performed between 18 and 21 March 2019. Work was postponed today due to complications with the <br />excavating equipment. Work will resume on Monday 25 March 2019 and the job will likely be <br />completed by Tuesday 26 March 2019. I would like to schedule a meeting at the site on Thursday <br />(3/28) or Friday (3/29) next week with both agencies to inspect the work performed. Would the EHD <br />and CVRWQCB be amenable to a site meeting on either of those days? <br /> <br />Please don’t hesitate to contact me with any questions or comments. <br /> <br />Thanks, <br /> <br /> <br />Brian W. Millman, P.G. <br />Senior Geologist <br />CA Professional Geologist No. 8574 <br />CA QSP/QSD No. 26882 <br />Advanced GeoEnvironmental, Inc. <br />Environmental • Compliance • Industrial Hygiene • Geotechnical <br />Phone: 800-511-9300 <br />Fax: 888-445-8786 <br />bmillman@advgeoenv.com <br />www.advgeoenv.com <br /> <br />“Working in Partnership with People, Business and the Environment” <br />This email/fax message is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, <br />use, disclosure or distribution of this email/fax is prohibited. If you are not the intended recipient, please contact the sender by email/fax and destroy all <br />paper and electronic copies of the original message. <br />
The URL can be used to link to this page
Your browser does not support the video tag.