Laserfiche WebLink
1 <br />Field, Cheryl [EHD] <br />From:McClellon, Robert [EHD] <br />Sent:Thursday, April 21, 2022 2:42 PM <br />To:Field, Cheryl [EHD] <br />Subject:FW: Pilkington - 500 E Louise Ave, Lathrop- WU1 excavation and removal: Trenching <br />Plan <br />Attachments:20190402163641669.pdf <br />From: Robert McClellon [EH] <br />Sent: Wednesday, April 3, 2019 8:19 AM <br />To: Brian W. Millman <bmillman@advgeoenv.com>; Linda Turkatte [EH] <LTurkatte@sjcehd.com>; Palmer, <br />Ann@Waterboards <Ann.Palmer@waterboards.ca.gov> <br />Cc: 'Dana Parry' <danap@reynoldsandbrown.com>; Joe Brusca <jbrusca@bruscaassociates.com>; Robert Marty <br /><rmarty@advgeoenv.com>; Djuth, Gerald@Waterboards <Gerald.Djuth@waterboards.ca.gov>; Roger Ashton <br />(roger@ecs-corp.net) <roger@ecs-corp.net>; Jesse Easter [EH] <jeaster@sjcehd.com>; Ambrose, Sabra@CalRecycle <br /><Sabra.Ambrose@CalRecycle.ca.gov>; Young, Glenn@CalRecycle <Glenn.Young@CalRecycle.ca.gov> <br />Subject: RE: Pilkington - 500 E Louise Ave, Lathrop- WU1 excavation and removal: Trenching Plan <br />Brian, I have modified your site map with trench locations. In the previous investigation an issue that was noted was that <br />the trenches did not determine extent. All of the trenches were located in the area known to have waste and did not <br />extend to area not know to have waste. I have placed a few trenches in areas that will determine extent. Please take a <br />look. One other thing is the pipe line. We will need to see the pipeline. So some of the trenches will need to be close to it <br />so we can determine if there is any waste under the pipeline. Robert <br />Robert McClellon, Program Coordinator REHS <br />San Joaquin County Environmental Health Department <br />1868 E. Hazelton Ave <br />Stockton, CA 95205 <br />Ph (209) 468-0332 <br />Fax(209) 468-8392 <br />From: Brian W. Millman [mailto:bmillman@advgeoenv.com] <br />Sent: Tuesday, April 02, 2019 7:33 AM <br />To: Robert McClellon [EH]; Linda Turkatte [EH]; Palmer, Ann@Waterboards <br />Cc: 'Dana Parry'; Joe Brusca; Robert Marty; Djuth, Gerald@Waterboards; Roger Ashton (roger@ecs-corp.net); Jesse <br />Easter [EH] <br />Subject: RE: Pilkington - 500 E Louise Ave, Lathrop- WU1 excavation and removal: Trenching Plan <br />Hello Robert and Linda, <br />A figure is attached depicting proposed confirmation trenching locations inside the Waste Unit 1 <br />excavation area. Advanced GeoEnvironmental is proposing 15 trenches approximately 45 feet apart <br />to cover the area and confirm wastes have been removed from Waste Unit 1 . The North-South <br />trenches will be approximately 20-25 feet long, the East-West trenches will be approximately 25-30